P77-3 SC30 Manual 9.27.2019 Page 4
MODEL P77-3 SC30 SPECIFICATIONS
Table 1: WASTE CHAMBER
CHAMBLER CAPACITY:
2540 lbs. of waste at 33 lbs/cu ft
CHAMBER VOLUME:
77 cubic feet
DOOR DIMENSION:
30" x 79"
HEIGHT TO DOOR:
54"
REFRACTORY:
4", 2800
°
f, 126 lbs/cubic feet
JACKET MATERIAL:
3/16” steel
HEIGHT TO TOP OF CHAMBER:
55" varies
Table 2: STACK AND SECONDARY
STACK:
(3) 18" Dia., 48" Long Steel Cast Lined
STACK CAP:
(1) 18” Diameter Stainless Steel
SECONDARY CHAMBER
(1) Aluminized Steel with Refractory Lining
Table 3: BURNERS
MODEL: OIL
MODEL: GAS
11/32” (350Kbtu) limiting orifices each lower burners
(3) Beckett SF Oil Burner W/ Flame Safety
(1) Midco 121 AND (2) Midco 83 w/safety controls
OPERATION:
Remote Standing Control Box with Temperature
Controls & Optional Recording
Table 4: GENERAL
INTERNAL DIMENSIONS:
32" W x 44" H x 83" L (less stack).
OVERALL DIMENSIONS (APPROX.), INCLUDING
COUNTERBALANCE WEIGHTS, BURNER, STACK AND
STACK CAP
6.7 ft W x 13.5 ft L x 26 ft H
ELECTRICAL SERVICE:
Standard-115 volt, 60hz, 30 amp, Also available --
220 volts, 50hz, 15 amp
WATER, FRESH (BURN CHAMBER SPRAY)
M
in.
60 psi at 0.8 gpm
GAS SERVICE BASED ON MAX RATING OF THE THREE
BURNERS: (ACTUAL BURN IS LESS, FACTORY SETS
FLOW AND CONTROL TURNS THEM ON AND OFF)
2,800,000 BTUH (piping sized accordingly)
Natural Gas: 7" W.C. (with burners operating)
Liquid Propane: 11" W.C. (with burners operating)
FUEL OIL SET RATE OF THREE BURNERS: (ACTUAL
BURN IS LESS, CONTROL TURNS THEM ON AND OFF)
Fuel Oil 3 burners x 3 gph = 9 GPH Burners pumps
move (not burn) approx 3x flow in two pipe operation.
TOTAL WEIGHT:
18,500 lbs (approximate, varies with features)
PAD REQUIREMENTS (MINIMUM):
6’ W x 11’ L x 6” Thick Concrete.
PAINT:
1200 degree primer 1200 degree paint
Table 5: CHARGING RATE
PATHOLOGICAL:
Approximate 1650 lbs. per charge at 33 lbs/cu ft of
typical pathological waste with a BTU/lb rating of
1000. Less pounds for volatile wastes. Chamber
may be recharged during burn with proper heat
resistant safety attire that protects from flash and heat
contact. Allow cool down for ash removal.
BURN RATE:
Will vary but may range up to 125lb./hr.
If on-site testing is required it is the responsibility of the purchaser and your Firelake dealer can assist in
the process. Outside installation is recommended with a minimum metal roof and three-sided metal
shelter, provided a
minimum
of four (4) foot clearance from any combustible material. Installations may
have special insurance or fire code requirements. Advise your insurance firm of the final placement.
Must be installed in accordance with local codes and ordinances, subject to governing regulatory
agencies. Consult local Fire Authorities for approval of roof penetrations and clearances.
Содержание P77-3-SC30
Страница 2: ...P77 3 SC30 Manual 9 27 2019 Page 2 PERSONAL PROTECTIVE EQUIPMENT FOR CRUSHING HEAT ABRASION AND DUST ...
Страница 3: ...P77 3 SC30 Manual 9 27 2019 Page 3 ...
Страница 12: ...P77 3 SC30 Manual 9 27 2019 Page 12 ...
Страница 28: ...P77 3 SC30 Manual 9 27 2019 Page 28 MIDCO BURNER J121 DS EXPLODED VIEW ...
Страница 30: ...P77 3 SC30 Manual 9 27 2019 Page 30 MIDCO BURNER J83 DS EXPLODED VIEW See parts list on following page ...
Страница 32: ...P77 3 SC30 Manual 9 27 2019 Page 32 BECKETT BURNER AF EXPLODED VIEW See parts list on following page ...
Страница 36: ...P77 3 SC30 Manual 9 27 2019 Page 36 ...
Страница 37: ...P77 3 SC30 Manual 9 27 2019 Page 37 MIDCO BURNER INTERNAL WIRING ORANGE L1 ...
Страница 38: ...P77 3 SC30 Manual 9 27 2019 Page 38 INCINERATOR WIRING DIAGRAM ...
Страница 39: ...P77 3 SC30 Manual 9 27 2019 Page 39 ...
Страница 40: ...P77 3 SC30 Manual 9 27 2019 Page 40 ...
Страница 41: ...P77 3 SC30 Manual 9 27 2019 Page 41 LINKAGE DIAGRAM ...
Страница 44: ...P77 3 SC30 Manual 9 27 2019 Page 44 ...
Страница 45: ...P77 3 SC30 Manual 9 27 2019 Page 45 FDC Future Design Control Specification Review ...