servICIng

tHe Burner

Check Diesel nozzle size and replace (see burner section 
for details).

ensure correct specification replacement nozzle is 
used.

1.  Check all diesel filters and replace as necessary.

2.  Remove burner and clean blast tube and ensure 

that airways are clear.

3.  ensure electrodes are clean, dry, not broken and are 

set as per burner specifications.

4.  Clean fan and photocell.

5.  once  again  check  flexible  diesel  lines  and                      

connections  for  damage  or  leaks,  replace  as       
necessary. replace flexible diesel lines every 2 
years.

Combustion Check
1.  Carry out a combustion analysis.
2.  Follow the steps as set out in the burner set-up         

section.

3.  Check safety operation, pull out the photo cell,  

cover and make sure the burner locks out.

4.  Check the thermostat operation. 
5.  allow the boiler to operate for at least two full “on/

off” cycles.

ensure service record is completed.

annual servicing must be carried out by a competent, 
qualified engineer, preferably familiar with Firebird 
products.

Do not commence service until both the electrical and 
diesel supply to the boiler have been safely isolated.

tHe dIesel tank

Check for diesel leaks. Draw off any accumulated water       
and sludge from the tank by opening the drain valve. 
Turn off the diesel supply and remove the filter bowl, 
then  wash  the  element  clean  with  diesel.  Fit  a  new             
element if required.

tHe BoIler

Remove combustion access door for access to baffles 
and to clean heat exchanger.

Cleaning a Firebird condensing boiler:

1.  Remove all baffles, including the tubular baffles in 

the condensing section and clean them.

2.  Remove the condense trap and clean it, place a tray 

under the connection for the trap. Vacuum out any 
lose debris from the chamber.

3.  Clean the inside of the boiler with a vacuum cleaner.

4.  Refit  all  the  baffles  and  the  condensate  trap           

securely.

5.  System pressure should not exceed 2 bar at full 

operating temperature. The expansion vessel 

 

 

should be checked during the annual service to 
ensure that it is operating correctly.

Check insulation sealing and the silver foil lining in 
combustion access door - replace if necessary.  Check 
graphite seal and replace if necessary.  When refitting 
this  door  be  careful  not  to  damage  the  foil  and              
insulation by over tightening.

Check that the condensate trap is secure in position, 
clean and free of combustion debris. ensure that the 
condensate drain is free and not blocked.

expansion vessel pre 

-charge pressure should be 

checked annually.

23

Содержание System 120

Страница 1: ...manual must remain with the householder once installation is complete HEATING SOLUTIONS ENVIRONMENT INNOVATION TECHNOLOGY Technical Manual Standard Efficiency Indoor Boiler System 90 26kW System 120...

Страница 2: ...ulations 5 3 1 Flue Regulations 6 3 2 Flue Systems 8 3 3 Liquid Fuel Supply 11 4 SYSTEM BOILER 4 1 End User Information 12 4 2 Installer Guidelines 13 4 3 Technical Details 17 5 COMMISSIONING 21 6 Ser...

Страница 3: ...erform reliably and as a regular check on its built in safety features It is important that servicing should be conducted by a competent engineer such as one who is OFTEC trained and registered All ap...

Страница 4: ...be sought following eye contact or prolonged reddening of the skin The small quantities of adhesives and sealants used in the product are cured They present no known hazards when used in the manner fo...

Страница 5: ...RMA Clean Air Approval number of BUR0801 This appliance and flue system has been tested by CRL Laboratories in New Zealand Certificate number 07 41180 and can be installed to meet the requirements of...

Страница 6: ...C D K F F L N O P H J Boundary Boundary F Q Q Q Q Q Q Q R Pressure Jet Location Appliance Burner Type Non Condensing ROI NI A Directly below an opening airbrick opening window etc 600mm B Horizontall...

Страница 7: ...for low level flue and low level balanced flue discharge when tested to BS EN 303 1 5 Terminating positions must be at least 1 8m distant from a fuel storage tank unless a wall with at least 30 minute...

Страница 8: ...ax length 6m Overall length must take into account bends where 45 bend 0 5m length and 90 bend 1m length INSTALLATION INSTRUCTIONS SUPPLIED WITH ALL FLUE KITS Elbows 45 90 Adjustable extensions 305 42...

Страница 9: ...pipe to ensure a positive seal IMPORTANT A 50mm 2inch gap must be left between the cone cowl and the wall Ensure Combustion air pipe protrudes beyond the outer surface of the wall GAS GAS GAS GA S GA...

Страница 10: ...ipe protrudes beyond the outer surface of the wall Flue extension for right hand outlet Push the flue pipe through the 125mm hole in the wall Apply high temperature sealant to the O ring on the inner...

Страница 11: ...allow household waste or hot ashes container in vicinity of oil storage tank or boiler flue outlet 11 Flexible Oil Pipe s Two flexible burner Diesel hoses are supplied with the boiler which must be w...

Страница 12: ...ent of the control thermostat failing and keeps the boiler safe The safety high limit thermostat will shut the boiler off and will require the limit button to be pushed to restart the boiler It is rec...

Страница 13: ...c pipe from overheating Additional measures must be incorporated into the system pipework for protection in these circumstances Plastic pipe must never be connected directly to the boiler and there mu...

Страница 14: ...sured in bar equals static head of system measured in bar plus 0 3 Sealed Heating Circuit The system must comply with BS 7074 Part 1 and BS 5449 Part 1 with a maximum water temperature of 80 C A manua...

Страница 15: ...s cold water is supplied through the boiler drain fill valve Heating Circuit This is the heating system including the boiler which is filled from the mains supply via a flex filling loop to a pressure...

Страница 16: ...erate the post purge function on the burner when applicable If a permanent live supply is not provided the burner will not operate Mains Burner Limit Lockout WIRING Electrical Supply The boiler and co...

Страница 17: ...Standard Efficiency output range Weight kg Dimensions mm H W D A B C E F G I J K L System 90 26kW 148 856 555 618 760 231 165 210 580 648 341 78 62 93 System 120 35kW 151 856 555 618 760 231 165 210...

Страница 18: ...ue elbow adaptor 210249 6 1 Gasket seal 110555 7 1 Stat pocket ACC003PKT 8 1 Air hose ACC000SSH 9 1 Control panel 314734 10 1 Casing left side 214744 11 1 Casing side cover 214748 12 1 Casing right si...

Страница 19: ...0555 7 1 Stat pocket ACC003PKT 8 1 Flue elbow adaptor 210249 9 1 Bolt M8X150 110437 10 1 Air hose ACC000SSH 11 1 Control panel 314734 12 1 Casing left side 214744 13 1 Casing side cover 214748 14 1 Ca...

Страница 20: ...er 15 mm dia 15 mm dia Circulating Pump 25 60 25 60 Integral Expansion Vessel Normal Capacity 12 litres 12 litres Expansion Vessel Pre charge Pressure 1 bar 1 bar Low Pressure Water Switch Filling Loo...

Страница 21: ...e a smoke gun to check clean combustion Flue gas analysis and fine tuning of burner u Ensure flue gas is over 50 C when setting CO2 u Allow the boiler to run for a period of time before fine tuning to...

Страница 22: ...matter Refill the system and again vent at all points as described Examine the complete system for water leaks having pressurised it to 1 2 5 bar Correct any leaks then check operation of the safety...

Страница 23: ...leaks Draw off any accumulated water and sludge from the tank by opening the drain valve Turn off the diesel supply and remove the filter bowl then wash the element clean with diesel Fit a new element...

Страница 24: ...nd commissioning 5 This warranty does not cover special incidental or consequential damages injury to persons or property or any other consequential loss 6 Servicing of the boilers is to be carried ou...

Страница 25: ...Valve Location Condensate Trap where fitted Condensate Trap Piped to Drain Condensate Trap Primed Float and Condensate Trap in Place Check Flue Seals Deflector Plate and Baffles Graphite Door Seal and...

Страница 26: ......

Страница 27: ......

Страница 28: ...the specification of our products at any time and be without obligation to make similar changes in products previously produced MLOBNZEBSE000 For further information on Firebird products please conta...

Отзывы: