(iv) FLUE CONNECTION
The flue should be at least 3m high and at least
125mm diameter or equivalent area.
Horizontal or negative gradients in the flue pipe
should be avoided.
It is recommended that a minimum height of
500mm from the stove should be established
before any significant change in the direction of
the flue.
(v) VENTILATION
Ventilation should be in accordance with National
Regulations. In the United Kingdom purpose
provided ventilation is not normally required, except in new build
houses.
(vi) GAS CONNECTION
The gas supply connection is behind the controls cover plate, left
hand side of the gas valve.
A nut and olive (strapped to the valve body), is supplied with the
stove.
The gas supply should incorporate a service tap,
be purged and any loose matter removed.
Connect the gas supply pipe and check for gas
soundness.