![Fire dept WD6 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/fire-dept/wd6/wd6_operating-instructions-manual_2290717004.webp)
Version: March 2019 4
Step 2: Pre-installation checklist
Ensure cavity dimensions are correct
– refer to technical specifications.
Ensure hearth dimensions are correct
– refer to technical specifications.
Plan flue path.
The starting point: Timber frame.
Note: Timber lintel to suit opening must be fitted after appliance has been fixed into position.