P7
3° INCLINATION
This
air
conditioner
has
a
system
to
drain
the
condensate
moisture
automatically
.
Please
read
carefully
the
following
instruction
.
Drill
a
hole
through
the
wall
measuring
30mm
in
diameter
in
the
position
shown
in
the
paper
template
,
marked
the
center
before
.
Drainage
occurs
by
gravity
.
For
this
reason
,
it
is
essential
for
the
drain
line
to
have
a
minimum
downward
inclination
at
least
3
degrees
throughout
its
length
.
With
this
solution
,
you
can
drain
the
condensate
moisture
to
a
suitable
place
to
do
not
cause
any
problems
to
your
neighbours
.
This
drainage
method
is
more
common
use
,
and
the
discharge
pipe
goes
outside
where
there
is
no
problem
to
connect
or
to
discharge
it
,
this
solution
is
OK
for
hot
country
and
normal
cold
temperature
outside
.
DRAINAGE
HOLE
(
P8
)
WALL
BRACKET
HOLES
(
P9
)
P6
,
7
,
8
,
9
Please
note
:
If
you
are
drilling
the
hole
above
ground
floor
level
,
please
ensure
that
an
area
has
been
secured
and
while
the
holes
are
drilled
the
outside
area
is
supervised
,
until
drilling
has
been
completed
.
INTAKE
AND
OUTLET
HOLES
(
P6
)
This
operation
should
be
carried
out
using
the
proper
tools
(
diamond
tip
or
core
borers
drills
with
high
twisting
torque
and
adjustable
rotation
speed
).
Find
the
holes
center
drilled
before
,
u
se
a
core
boring
head
having
a
diameter
of
200mm
to
drill
the
two
holes
for
intake
and
outlet
the
air
.
P6
P8
P9
(
See
image
P7
)
Drill
the
holes
for
anchoring
the
fastening
bracket
to
the
wall
using
preferably
the
26
holes
with
8mm
diameter
showed
in
black
on
the
paper
template
.
As
the
unit
is
installed
on
high
wall
,
it
is
recommended
that
all
the
holes
should
be
fixed
with
anchor
bolts
.
Содержание Sydney ICOOL
Страница 1: ...Installation and User Manual Sydney ...
Страница 14: ......
Страница 15: ...3 3 HEATING MODE 3 4 COOLING MODE ...
Страница 17: ...3 7 SLEEP MODE 3 8 AUTO MODE ...
Страница 18: ...3 9 TIMER OFF FUNCTION 3 10 TIMER ON FUNCTION 16 ...
Страница 22: ...20 ...