background image

TCP/IP PORT (LAN)

POWER ADAPTER 
PORT

RS484 PORT

2. RS485 Network Connection

1. RS485 Single Connection

RX+

RX-

RS232/ RS485 

Data Converter

RX+

RX-

RS232/ RS485 

Data Converter

RS232 PORT

RS232/RS485 SERIAL 
CABLE PORT

USB PORT

Wall

4 feet / 1.2 meter
(recommended)

Step 1

Determine the Location and Positioning 

of the Installation

•  

Avoid installing the terminals in locations that has contact with 
a strong light source (e.g direct sunlight, spotlight, fluorescent 
light, etc)

• 

Avoid installing the terminals in locations with high moisture or 

condensation levels in the air

• 

The recommended installation height of the terminal from the 
ground is 1.2 meters. 

Step 2

Mounting of Terminals

A. MOUNT ON WALL

•  

After determining the height of the terminal from the ground 
level and having made the relevant marks on the wall, based on 
the measurements in Appendix I, drill the screws into the wall to 
hang the terminal.

Installation Guide

We Make Things Easy

w w w . f i n g e r t e c . c o m

AC100 Series

Fingerprint Time Attendance System

B. FLEXI- KIT

FingerTec offers flexi-kits for all its time attendance models. Attach 
the terminal on the flexi-kit for convenience.

Step 3

Wiring for Power Supply

The power jack is positioned on top of the terminal, labeled 
Power Adapter Port in the below diagram. 

Please use the power adaptor provided in the package or alterna-
tively you can opt for a linear power supply with specifications of 
5VDC 2A. Plug one point of the power adapter to the terminal and 
the other end to the power outlet. Don’t exceed the recommended 
voltage or current to avoid damaging the terminal.
 

Отзывы: