TCP/IP PORT (LAN)
POWER ADAPTER
PORT
RS484 PORT
2. RS485 Network Connection
1. RS485 Single Connection
RX+
RX-
RS232/ RS485
Data Converter
RX+
RX-
RS232/ RS485
Data Converter
RS232 PORT
RS232/RS485 SERIAL
CABLE PORT
USB PORT
Wall
4 feet / 1.2 meter
(recommended)
Step 1
Determine the Location and Positioning
of the Installation
•
Avoid installing the terminals in locations that has contact with
a strong light source (e.g direct sunlight, spotlight, fluorescent
light, etc)
•
Avoid installing the terminals in locations with high moisture or
condensation levels in the air
•
The recommended installation height of the terminal from the
ground is 1.2 meters.
Step 2
Mounting of Terminals
A. MOUNT ON WALL
•
After determining the height of the terminal from the ground
level and having made the relevant marks on the wall, based on
the measurements in Appendix I, drill the screws into the wall to
hang the terminal.
Installation Guide
We Make Things Easy
w w w . f i n g e r t e c . c o m
AC100 Series
Fingerprint Time Attendance System
B. FLEXI- KIT
FingerTec offers flexi-kits for all its time attendance models. Attach
the terminal on the flexi-kit for convenience.
Step 3
Wiring for Power Supply
The power jack is positioned on top of the terminal, labeled
Power Adapter Port in the below diagram.
Please use the power adaptor provided in the package or alterna-
tively you can opt for a linear power supply with specifications of
5VDC 2A. Plug one point of the power adapter to the terminal and
the other end to the power outlet. Don’t exceed the recommended
voltage or current to avoid damaging the terminal.