4
Preparation
Recommended Equipment List
•
Variable speed drill
•
Drill bit:
⅛”
(for guidance)
¼” (to drain) and ½” (for tap)
•
Pliers
•
Phillips screwdriver
•
Plastic tube cutter / Stanley Blade
The unit is supplied with white tubing which is to be cut to length
through each stage of installation.
Mark 1 (
Red stopper
)
– Cold water supply to RO system
Mark 2 (Black stopper)
– Wastewater to drain
Mark 3 (
Blue Stopper
)
– Last stage on RO system to water outlet.
Fittings Included