![Finelite Direct Curved HP-4 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/finelite/direct-curved-hp-4/direct-curved-hp-4_installation-instructions-manual_2289566010.webp)
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98571. EFFECTIVE DA
TE: 12/03/19
HP-4 Direct Curved Installation Instructions
10 of 12
Step 6 - Securing Luminaire Joints
B. Make Electrical Connections
•
Connect plug-together wiring.
A. Secure Joint with Yoke Brackets
Cross Section View
•
NOTE: Straight to curved uses the same joining method as curved to curved (shown).
•
Before installing yoke brackets, ensure the joining ends of luminaires meet flush and square.
•
CRITICAL: Ensure yoke brackets properly engage with aligner sleeves.
•
Secure joint by threading (but not yet tightening) yoke screws through yoke brackets and
washers and into the aligner sleeves.
•
Level each luminaire to desired height by depressing top of grippers to adjust cable lengths.
•
Tighten yoke screws¹ until joint seam of luminaires is closed.
Yoke Screw (provided)
Yoke Bracket (provided)
Washer (provided)
Aligner Sleeve
Simple
Plug-Together
Wiring
Level Luminaires
Plug-Together Wiring
¹ Screwdriver with 6" bit required.
Bottom-Up View
Bottom-Up View
Yoke Bracket w/ Screw and Washer
#10-32 x 5/8" (provided)
Curved
Joints
Depress to release
locking mechanism