
11
WORK
1. PREPARING TO WORK
Certain operations must be carried out before starting any work:
1.
Verify that the tanks are properly inserted in the housings and connected.
2.
verify that the switches are in the off (“0”) position
3.
connect the cable to the socket
ATTENTION: Verify that the electricity socket has a protective
conductor (or an earth conductor).
ATTENTION: Verify that the power supply voltage and frequency
comply with the nominal values required by the machine.
ATTENTION: Verify that the power supply cable is in perfect condition.
4.
Carry out the operations to prepare the machine
5.
lower the squeegee command lever in order to start working
4.
press the main switch (1) and verify that the green indicator light comes on
5.
press the suction switch (2)
6.
press the solenoid valve switch (3)
At this point, the machine can work efficiently until the detergent solution runs out; use the
operating lever that activates the brushes (4)
2. OVERFLOW
DEVICE
The machine is fitted with a ball filter which is activated when the recovery tank is full, causing
the suction tube to close.
In this case, it is necessary to switch off the machine and empty the recovery tank.
ATTENTION: This operation must be carried out wearing gloves to
protect against contact with dangerous solutions.
Содержание GENIE E
Страница 1: ...USE AND MAINTENANCE MANUAL GENIE E ED 09 2019 ENG ORIGINAL INSTRUCTIONS Doc 10004515 Ver AC...
Страница 22: ...22...
Страница 23: ......