FIM Flexy Twin Скачать руководство пользователя страница 3

 

           e-mail: [email protected]    

           www.fim-umbrella.com 

 

 

 

 

 

ASSEMBLY INSTRUCTIONS 

 

COMPONENTS (Pict. 1, 2): 

 

Pict. 1A – FLEXY TWIN WITH A SINGLE CANOPY 

(Fig. 2A) Nr 1 

sliding canopy (A)

 with the 

crossbar (C)

(Fig. 3A) Nr. 1 

Upright pole (DA)

  

(Fig. 4a) Nr 1 

Lever group (E) and a bag containing Allen keys of 3 (e3)- 4 (e4)- 5 (e5) 

(Fig. 5A) Nr 1 

hot dip galvanized steel base (F),

 

set of 

steel 

ballasts, a bag of hardware (H) containing 6 feet (f),

4 screws M 10x30 (d), an Allen key 6 (e6). 

 

Pict. 1B – FLEXY TWIN WITH A DOUBLE CANOPY

 

(Fig. 2B)  Nr 2 

sliding canopies (A)

 with the 

crossbar (C)

(Fig. 3B)

 

Nr. 1 

Upright pole (DB)

  

(Pict. 4B) Nr 2 

Lever groups and a bag containing Allen keys of 3 (e3)- 4 (e4)- 5 (e5) 

(Pict. 5) Nr 1 

hot dip galvanized steel base (F),

 

set of 

steel 

ballasts, a bag of hardware (H) containing 6 feet (f), 4 

screws M 10x30 (d), an Allen key 6 (e6). 

 

 

FREESTANDING BASE ASSEMBLY AND POSITIONING (Pict. 6A, 6B and 6C) 

 

Take out the content of the 

bag of hardware

 

(H)

 Screw the 

feet (f)

 to the 

base (F), 

put the base where you want to assemble Flexy Twin. Make sure that the base is 

level

 

using

 

the 

adjustable

 the 

feet (f). 

Mount

 the 

upright pole (DA) or (DB) 

to the

 base (F) 

with 4 

screws (d) 

and tighten them well with an

 Allen key (e6). 

Place

 

the 

set of 

steel 

ballasts

 

(G’) (G’’) 

on the carrier plate

 and bolt the ballasts 

firmly down

 

 

MOUNTING THE SLIDING CANOPY (Pict.7,8,9) 

Remove 2

 screws (h) 

from the 

crossbar (C) 

Remove

 

the

 screw (i) 

and

 washer (M) 

from the

 lever group (E) 

with an

 Allen key (e3). 

Insert the 

crossbar (C) 

into the sliders of the 

canopy (A) 

and make sure that the two ends of the cord are not tangled together and 

stay parralel. 

Fix the

 lever group (E) 

to the

 crossbar (C) 

with the

 screws (h).

 

Δ CAUTION: tighten the screws with an Allen key (e5). 

 

MOUNTING THE SLIDING CANOPY ON THE POLE (Pict. 9,10,11) 

 CAUTION:  To avoid damage the operation has to be done simultaneously by two persons with  2 step ladders.  

Raise the sliding canopy and join  the 

lever group (E)

 to the 

pin (P) 

of the 

upright pole (DA 

or 

DB). 

Remount the

 flange (I) 

and fix everything with

 2 screws (g). 

 CAUTION: 

when the 

lever group (E)

 is joint to the 

pin (P) 

push the end of the canopy facing up while 

2 screws (g)

 are 

pulling. It should be firmly tightened. 

Pull the lever group and tilt the canopy on one side. Insert the 

washer (M) 

into the 

buttonhole (R) 

and fix it with the 

screw (i). 

 CAUTION: 

The procedure is necessary for the wind resistance. 

Push the slider 

(N’) 

against the 

lever group (E) 

and screw the handwheel stem in the hole of the 

crossbar (C). 

Remove the 

weight (S) 

applied on the double cord, the weight is divided in 2, put it back after the 

cord (O) 

is inside the 

pulley 

(T).

 

 

Important

it is essential for the subsequent smooth operation of the canopy that the two ends of the cord are kept  extended 

and not tangled together . 

 

 

 

 

Содержание Flexy Twin

Страница 1: ...Flexy Twin...

Страница 2: ...ep this handbook for future reference IMPORTANT SAFETY INSTRUCTIONS APPLIES TO ALL IN THIS SECTION 1 INSTRUCTION Please read and follow all the instruction Only one manual is supplied for all the poss...

Страница 3: ...MOUNTING THE SLIDING CANOPY Pict 7 8 9 Remove 2 screws h from the crossbar C Remove the screw i and washer M from the lever group E with an Allen key e3 Insert the crossbar C into the sliders of the c...

Страница 4: ...sable not to perform this operation in the bright sun For washing in industrial washing machines take the cover off the structure and have it washed with a mild detergeant delicate program extensive r...

Страница 5: ...Fig 1A Fig 1B Fig 2A Fig 2B Fig 5 Fig 3B Fig 4A Fig 4B B C A C A C A DA DB e3 e4 e5 E E E e3 e4 e5 G G G F H e6 f d Fig 3A B G CARRIER PLATE PLUS WEIGHT PLATES...

Страница 6: ...G Fig 6A Fig 6B f d d d d d d d d d f f f f f G G G F DA DB G f f f f f f G G G F I I I L g g g g g g L P P P Fig 6C 220 V SINGLE CANOPY UNIT DUAL CANOPY UNIT...

Страница 7: ...C Fig 9 Fig 8 h C h i M E A h h E m C O O h E O N h C Fig 7 N N N N N N N N N N N E P...

Страница 8: ...E I g g P Fig 10...

Страница 9: ...M i E R Q Fig 11...

Страница 10: ...m N S O T C S Fig 11...

Страница 11: ...e support arm and grab one of the included fastening screws Start the screw so it will pinch the welt cord in the track making sure you do not push back the panel in the process Note that the screw ne...

Отзывы: