background image

 

26-0582 Issue 15 

  
 
 

          

 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

Fire Detection & Alarm System Control Panel V3 

(Suitable for Quadnet control panels from V2.00)

  

 
 
 
 
 
 
 
 

Control Panel Engineering and 

Commissioning Manual        

 (TO BE RETAINED BY THE COMMISSIONING ENGINEER) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание Quadnet

Страница 1: ...6 0582 Issue 15 Fire Detection Alarm System Control Panel V3 Suitable for Quadnet control panels from V2 00 Control Panel Engineering and Commissioning Manual TO BE RETAINED BY THE COMMISSIONING ENGINEER ...

Страница 2: ...e of publication Fike shall be under no liability whatsoever in respect of such contents Due to the complexity and inherent importance of a life risk type system then training on this equipment is essential and commissioning should only be carried out by competent persons Fike cannot guarantee the operation of any equipment unless all documented instructions are complied with without variation E O...

Страница 3: ... Loop Loading 12 General System Schematic 13 Control Panel Main PCB 14 Control Panel Terminals 16 Network 22 Network Topology and Cabling 22 Network Cable Specification 22 Network Connection Schematic 23 Network Terminals 23 General Operation of Control Panel 25 Control Panel Front 25 LED Indication 26 Fire Alarm Controls 28 System Controls 28 Access Levels and Codes 29 Access Level 1 Normal 29 Ac...

Страница 4: ...on Faults 53 Intermittent and Recurring Faults 54 Summary of Messages 56 Advanced Connections 59 Monitored Relays 59 Technical Data 60 Control Panel 60 Power Supply Unit 61 System Version Compatibility 61 OSP Version Compatibility 61 Resistor Colour Codes 62 Battery Calculations 63 Installation Checklist 64 Commissioning Checklist 65 Loop Continuity and Insulation Test Results 66 Network Continuit...

Страница 5: ... person or organisation Anti Static Handling Guidelines Immediately prior to handling any PCBs or other static sensitive devices it is essential to ensure that a personal connection to earth is made with an anti static wrist strap or similar apparatus Always handle PCBs by their sides and avoid touching any components PCBs should also be stored in a clean dry place which is free from vibration dus...

Страница 6: ...or itself The detector is capable of being remotely programmed for different modes of detection Thus the Quadnet system is an analogue addressable system but with the processing power distributed across the entire system This dramatically reduces the complexity of the control panel and the data traffic and improves the efficiency of the system The system addressing is carried automatically upon in...

Страница 7: ...ay be affected by extreme environmental conditions The position selected for its installation should therefore be clean and dry not subjected to high levels of vibration or shock and at least 2 metres away from any pager or radio transmitting equipment Ambient temperatures should be within the range given within the Technical Data section i e not directly over a radiator or heater or in direct sun...

Страница 8: ...and the ribbon cables unplugged from the main backplane Remove the collar flange assembly complete with doors Loosen the 4 screws in the keyhole slots 2 per side Remove the retaining screws 2 one at the top and one at the bottom Lift off the collar flange assembly complete with doors and set aside The backplane is mounted on a chassis which is fixed into the box by 1 screw at the top There are two...

Страница 9: ... to its full extent and the ribbon cables unplugged from the main backplane Then it must be gently taken beyond its fully opened extent This will cause the hinge pins to pop out of the door The door can then be completely removed Note a minimum gap of 320mm must be left between the back box and any wall or projection to allow the door to be gently taken beyond its full extent and removed Physical ...

Страница 10: ...nel The two rows of knockouts at the top are suitable The two rows of knockouts in the rear at the top are suitable The main rear face must be kept clear for mounting the electronics The two rows of knockouts at the bottom are suitable Technical Data Dimensions Width x Height excluding flange 415mm x 415mm Width x Height including flange 445mm x 445mm Depth 75mm Flush Mount Hole Size Backbox only ...

Страница 11: ...essable circuit must be installed as a loop with a maximum length of up to 2 km Addressable spur circuits are NOT permitted with this system In order to protect against possible data corruption it is important ensure the following points are adhered to 1 The addressable circuit cable screen must be connected to the loop SCRN terminal at the control panel Both ends must be connected using the termi...

Страница 12: ...I O Module in Box 3 600 0092 Remote Indicator 0 5 The Quadnet OSP programming software v2 02 or later v2 04 or later required for the latest devices automatically keeps control of the quantities and DLU ratings of devices on the loop and will warn the engineer if the limit is reached It will not allow a system to be programmed to exceed the maximum DLU rating It can detect the type of the device a...

Страница 13: ... General System Schematic Sita Multipoint Sita MP I O Sita MCP Remote Indicator Sita Loop I O Module ADDRESSABLE LOOPS ALL 2 CORE 1 5mm 2 MAX 2km QUADNET CONTROL PANEL QUADNET PSU 1 X 2C1 5 2 X 2C2 5 QUADNET PSU OPTIONAL UP TO 4 MAX PER PANEL 1 X 2C1 5 2 X 2C2 5 ...

Страница 14: ...DS CONTRAST LCD BACKLIGHT LCD RIBBON RIBBON A TO TERMINATION PCB RIBBON B TO TERMINATION PCB RIBBON C TO TERMINATION PCB RIBBON D TO TERMINATION PCB PRIINTER PORT NETWORK CARD KEY SWITCH REMOVE LINKS TO PROGRAM EXTERNAL FLASH PRINTER CONTROL PROCESSOR COMMS CONTROLLER BUZZER KEYSWITCH MAIN CIE PROCESSOR 10 0049 PSU CONTROL ISP DO NOT CONNECT CIE PCB POWER TEST DISABLED FAULT FIRE 10 0050 LED PCB L...

Страница 15: ...w software is compatible with the system hardware version and with the other panels and components in the system Note that firmware upgrades are only permitted to be carried out by Fike engineers or trained installation engineers operating under specific instructions from Fike Technical Support LCD Contrast The LCD contrast may be adjusted by rotating the screw on the variable resistor located in ...

Страница 16: ... than where indicated Similarly when removing do not pull the centre of the card but pull from both ends at the same time so that the PCB does not get flexed o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o BUFFER MICRO PROC BUFFER POWER FET POWER FET FIRMWARE UPGRADE ONLY SERIAL PORT BOTTOM EDGE PRESS HERE ONLY PRESS HERE ONLY TOP EDGE LOOP CARD RIBBON CABLE CONNECTIONS TO MAIN CONTROL...

Страница 17: ... output 2 causes the relay to operate as a Common Fault output where the relay is de energised in the fault condition Various other modes may also be set using the Quadnet OSP programming software However to meet the requirements of EN54 2 Output 1 must be left as a fire output Common Fire or Zonal Fire and Output 2 must be left as Common Fault On later versions of the panel hardware Output 2 is o...

Страница 18: ...sitive connection MO Monitored Output 0V connection SCRN Field cable screen connection Auxiliary Power 24V 0V SCRN An auxiliary nominal 24V DC power supply is available to power ancillary devices requiring up to 30V DC The maximum output current is 200mA The Auxiliary Power is protected by a F315mA fuse labelled FUSE 3 It is suggested that additional Power Supply Units be installed to provide powe...

Страница 19: ... END2 SCRN Each loop 1 4 addressable circuits must be connected to its appropriate End 1 and End 2 terminals Communications normally run from Loop End 1 but in the event of a continuity fault both ends of the circuit will operate It is important that the cable screen is only connected at the control panel using the SCRN terminal provided not at any earthing point and that the screen continuity is ...

Страница 20: ...t be set to OFF It is important to ensure that the new version is compatible with your hardware version and with other software used in the system such as loop cards PSU and repeaters etc If not then all items would need to be updated Note that firmware upgrades are only permitted to be carried out by Fike engineers or trained installation engineers operating under specific instructions from Fike ...

Страница 21: ...n length The cables screens should be connected at each end using the terminals provided If a greater distance is required between the main control panel and the PSU then two 2 core 2 5mm 2 cables should be used for the 24V and 0V power connections up to a maximum of 9 5m in length The cable screens should be connected at each end using the terminals provided Terminal Description A Serial Data con...

Страница 22: ... BS 5839 Pt1 2002 Amendment 2 2008 and BS 7671 wiring regulations along with any other standards relevant to the area or type of installation A cable complying with the BS 5839 Pt1 2002 Amendment 2 2008 Category 1 cables required to operate for prolonged periods during fire conditions is required This must be a 2 core 1 5mm 2 screened fire resistant cable ie MICC FP200 Firetuff Firecell Lifeline o...

Страница 23: ...ore any networking facilities may be used the optional Quadnet network card must be fitted to the control panel main PCB CIE as shown above Network cabling connects to the Network terminals on the backplane PCB All network cables should be 2 core 1 5mm2 screened and fire rated The 2 Network Ports NET1 2 may be connected in any sequence NETWORK RING PANEL 001 PANEL 002 PANEL 003 PANEL 004 RIBBON D ...

Страница 24: ... as shown below The 2 Network Ports NET1 2 may be connected in any sequence between panels Note your network connections for future reference whilst installing them Eg Panel 001 Network Port 1 connected to Panel 004 Network Port 2 Note Terminal blocks shown below where the screen is not connected to the panel are fitted to prevent the screen from shorting or touching other circuits PANEL 001 PANEL...

Страница 25: ...s Control Panel Information Window Active Information Window Prompt Window Network Information Window Zonal Indication LEDs Fire Alarm Controls System Indication LEDs System Controls 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 7...

Страница 26: ...ULT Yellow Flashing Continuous The mains supply has failed check the fuse and the 230V AC supply on the PCB AC terminals A battery supply charger fault has been detected check the fuse and the battery voltages 9 EARTH FAULT Yellow Flashing An earth fault has been detected where a path exists from the circuit wiring to earth Remove circuits one at a time to discover which one and then rectify An ea...

Страница 27: ...te and sending a Technical Alarm signal to the panel No indication of a Technical Alarm is given on the display 18 CONFIRMATION Yellow Continuous A smoke detector is in the alarm confirmation state awaiting confirmation or reset 19 DELAY Yellow Continuous An action has been started which utilises a programmed delay 20 ALARMS Yellow Flashing Continuous The alarm sounders have been activated from th...

Страница 28: ...two ways as required 1 Use the UP DOWN keys to move the highlighted selection and press ENTER to select the chosen one 2 Enter the desired option number and press ENTER to select it Press the Esc key to exit to the previous menu 1 Delay On Off 2 Test Display 3 View Logs 4 Disable Enable 5 Set Time Date 6 Test Modes 7 Day Night Mode 8 Find Device fire alarm controls turn key to enable controls sile...

Страница 29: ... order access any of the menus Menu examples shown below are for the V3 control panel Menus in some earlier panel versions may differ Access Level 1 Normal Controls Enabled LED off At Access Level 1 Normal the main Fire Alarm Controls are disabled and the Controls Enabled LED is switched off A valid access level code must be entered in order access any of the menus Delay Override To comply with EN...

Страница 30: ...rnings Log will display any current warnings These are displayed in text format and may be scrolled through by pressing the UP and DOWN keys 1 Delay On Off 3 Manual Call Point with sounder 5 Sounders Strobes 4 Manual Call Point 6 Input Output Modules 7 Conventional Zone Module 6 Network Events 1 All Events 2 By Event Type 3 By Panel 4 By Date 6 Default to all enabled 3 View Logs 2 Multipoint 1 Mul...

Страница 31: ... detection zone will be disabled The control panel will indicate that disablements are present a disablement event will be recorded to log the device LED will still operate when activated and an event will be recorded in the log but no programmed actions will occur The sounder within the device will still operate if triggered from elsewhere on the system 4 Disable Enable 2 Device This function all...

Страница 32: ... test mode has been selected 6 Test Modes 2 Local Audible Test The Local Audible Test function allows the selection of one or more detection zones to operate in a one man walk test mode with local sound On triggering a device the device LED operates the sounder within that device operates and the event is recorded into the event log as a test activation but the control panel does not show an alarm...

Страница 33: ...und and a disablement to be written to log 7 Day Night Mode 3 End all Overrides This function ends any override on the Day Night Mode and all programmed actions are reinstated The control panel event log will indicate that all actions have been reinstated 7 Day Night Mode 4 View Day Night Setting This function allows the user to view the start and finish times for each day This function allows the...

Страница 34: ... Multipoint 5 By Date 2 Current Faults 3 Current Disablements 4 Current Tests 5 Event Logs 3 Disable Enable 1 Detection Zone 2 Device 3 Sounders 4 Fire Outputs 5 Fault Outputs 4 Set Time Date 5 Test Modes 6 Day Night Mode 1 Silent Test 2 Local Audible Test 1 Override into Day Mode 2 Override into Night Mode 3 End all Overrides 3 System Test 4 View Day Night settings 3 Manual Call Point with sounde...

Страница 35: ...s to illuminate the LCD screen to blacken and the panel buzzer to sound in order to verify their correct operation 3 Disable Enable 1 Detection Zone This function allows the disablement or enablement of a detection zone Thus all the input devices Manual Call Points detectors and inputs within that detection zone will be disabled The control panel will indicate that disablements are present a disab...

Страница 36: ... not sound and the control panel does not show an alarm After approximately 5 seconds the system will reset the device and another may be tested The control panel event log will indicate that a test mode has been selected 5 Test Modes 2 Local Audible Test The Local Audible Test function allows the selection of one or more detection zones to operate in a one man walk test mode with local sound On t...

Страница 37: ...the loop before removing power from the loop If this is not done it may cause random faults and stoppages during subsequent initialisation The loop must also be stopped before removing adding replacing devices Should problems occur during initialisation stop the loop and wait for approximately five minutes before initialising the loop again The previously improperly shutdown device should reboot s...

Страница 38: ...a Configuration Data Error fault 7 Engineer Controls 2 View Edit Attributes 1 Device This function allows the user to view and edit if required the attributes for each loop device These attributes include the device type serial number address zone description input output detection and alarm information You may also read the optical and heat standing levels for Multipoint detectors If changes are ...

Страница 39: ...o be located and the test to be ended 7 Engineer Controls 4 Loops This function allows the user to switch on or off any used or unused loops Please ensure that any loop cards in use are fitted and switched on 7 Engineer Controls 5 Printer This function allows the engineer to change printer settings for the optional onboard printer and to print various reports on demand The engineer can turn printi...

Страница 40: ...e accessed by lifting the front cover on the printer Use the paper feed button located on the right hand side opposite the Status indicator LED to feed through the last few centimetres of paper Fit a new paper roll onto the carrier The printer incorporates an automatic paper feed facility With a new paper roll mounted on the carrier and with a clean straight edge to the paper present the paper to ...

Страница 41: ...out In order to activate the function install the devices as normal and refer to the Quadnet OSP Programming Manual for further details 3 OPTIONS TO CHOOSE 1 2 3 Smoke is detected in one room of an apartment All the sounders in that zone will sound The sounder in that detector will sound for 30 seconds The sounders in a linked zone will sound i e care taker If there is no smoke in the room between...

Страница 42: ...n the Cause Effect area For a further time period 10 min minus Alarm Confirmation Delay the activation of the smoke detector will cause an immediate alarm depending on the programming of the system Cause Effect The activation of any Heat detector even in the same device as the smoke detector in Alarm Confirmation generates an immediate alarm depending on the programming of the system Cause Effect ...

Страница 43: ...able device loops may now be initialised This is when the control panel interrogates the loops one device at a time for type serial number and position before allocating a loop address number Initialisation is carried out from the control panel keypad by utilising one of the three loop initialisation commands located within the Access Level 3 Engineer menu Install one device and note its serial nu...

Страница 44: ...bers are in the positions on the loops that were expected amend the configuration to suit the site and check it carefully 4 Download the configuration from the PC to the control panel 5 Initialise the loops 6 Reconfigure the addressable devices with the Reconfigure command at Access Level 3 Engineer 7 Reset the system 8 Test for correct operation NOTE It is imperative that the correct version of O...

Страница 45: ...tails may then be entered into the Quadnet OSP programming software in order to program the operation of the system End User Training A Fire Alarm System is of little use if the end user and or the responsible persons who will be present in the building do not know how to operate and respond to the system It is therefore essential that commissioning includes training for the users of the system an...

Страница 46: ...if the system is initialised Without knowing this it is not possible to be sure that all devices have initialised correctly Label the Loop Ends Make a clear note on the Loop cables adjacent to the terminal block to show LOOP END 1 and LOOP END 2 Thus if the addressable device loop is reversed for any reason it will be plainly visible from the labels Note the Loop Readings Make a clear note in the ...

Страница 47: ...adnet OSP and store it safely on site along with an up to date site plan marked with devices serial numbers and wiring order If any return visits are necessary all the relevant information on the system will be available without having to carry out an Upload of data to the PC This includes address serial number device configuration and zonal configuration data ...

Страница 48: ...ice only provides continuity when energised by the control panel Measuring the insulation resistance between the Loop ve and the Loop Screen should show no continuity Remember that a low voltage electronic test meter should be used and its accuracy is likely to be low when measuring high resistances but this will give enough information to show insulation integrity Do not use a high voltage insula...

Страница 49: ...op When all possible devices have been initialised the control panel will indicate either that initialisation is complete or not and the number of devices found The following LEDs will be extinguished as long as no other faults exist DISABLED and LOOP FAULT DISABLE Or The following LEDs will remain on DISABLED and LOOP FAULT DISABLE After initialising the loop and pressing ESC to exit the STANDARD...

Страница 50: ... leave a system with a device missing positive cores linked together in this way as all successive devices will be displaced The loop must be re initialised to clear this fault Please note A short circuit between cores with a value of between 3K and 300 ohm can cause corruption of the data on the loop and although no Short Circuit fault is reported the system integrity will be compromised Loop ve ...

Страница 51: ...tialised and commissioned as required Earth Faults General If the control panel detects a short circuit to earth screen from one of its supply rails either 0v or ve an Earth Fault will be displayed Remove the circuit cables connected to the control panel one at a time and reset the system When the circuit with the earth fault is disconnected the earth fault will clear within approximately 30 secon...

Страница 52: ...c test meter at that individual length of cable due to the inbuilt short circuit isolators in each device To locate this manner of fault split the ve core of the loop at approximately a half way point on the loop then reinitialise with only Loop End 1 connected to the control panel Even though the initialisation will fail due to the enforced open circuit the earth fault will only be indicated if i...

Страница 53: ...on from screen to the building structure which may not be earthed eg concrete plaster suspended ceilings as such connections can inject noise into the screen causing communication problems 3 Ensure the correct number of devices has been initialised by checking at Access Level 3 Engineer for the number of devices found on the last initialisation and compare that with the number of devices programme...

Страница 54: ...layed In either case the event generated should be dealt with before the loop is reinitialised Firstly investigate and rectify any Fire activations which are displayed These may vary from Manual Call Points which have not been reset to Multipoint detectors which are contaminated Secondly investigate and rectify any fault conditions which are displayed These may vary from Input open circuit to a Mu...

Страница 55: ... yellow loop fault LED These faults will also get logged in the event logs The adjacent devices on the loop will open their isolators to isolate the section of cable which is in fault The panel will use both ends of the loop to communicate with the devices so no devices are lost In these cases as no devices are lost the faults may appear to clear but it is most important to check the fault LEDs an...

Страница 56: ...or or a Loop powered I O module is in the alarm state Reset the triggering input to that device before resetting the control panel 7 AUX output short circuit Investigate the output for short circuit An auxiliary input at a detector or a Loop powered I O module is in the short circuit state Check that the 3k3 EOL resistor is fitted or that the EOL switch is turned on but not both Check also that al...

Страница 57: ... device found indicated by xxxx and the following device If no faults can be found try temporarily linking out that device to see if initialisation will pass that point thus the device may need replacing 19 Loop not initialised Initialise the loop The addressable circuit has not been correctly initialised Check that the number of devices found matches the number of devices on the system 20 Loop lo...

Страница 58: ...g optical level the level of reflection received by the optical receiver within the Multipoint optical chamber probably caused by contamination has fallen as far as the automatic recalibration of the device can allow Check that the optical chamber is correctly locked in place If it was then a replacement optical chamber should installed If this still does not rectify the problem then a new electro...

Страница 59: ... MO COIL CONTACTS NC COM NO 24V FIRE RELAY 4k7 The relay must be dioded for polarisation and suppression as shown These diodes should be marked 1N1004 or similar and may already be located on the relay PCB if it is designed for Fire Alarm Systems If the relay is a general purpose plug in relay then the diodes may need to be added externally ...

Страница 60: ... on Audible Indication 2 5kHz Buzzer Continuous in fire Intermittent 0 3s on 2 1s off in fault Keypad 4 way dedicated 17 way alphanumeric Fire Alarm Controls System Controls Event log 1000 events Inputs and Outputs Relay Outputs x 4 Monitored Outputs x 2 Monitored Inputs x 4 Volt free contacts SPCO 30V DC 1A max per contact 2 x 24V conventional monitored outputs Fire Fault Signal Technical Alarm 1...

Страница 61: ...3 00 Alarm Confirmation Local Device warning V1 00 V2 00 V3 00 Alarm Confirmation Zonal Warning V1 00 V2 00 V3 00 Alarm Confirmation Display Option V1 00 V2 00 V3 00 Alarm Confirmation Zonal Linkage V1 00 V2 00 V3 00 1 4 loop plug on expansion V1 00 V2 00 V3 00 Network V1 00 V2 00 V3 00 Site Upgradeable firmware V1 00 V2 00 V3 00 View Edit full device attributes at control panel V1 00 V2 00 V3 00 ...

Страница 62: ...d be viewed with this band to the right as follows reading from the left and side of the resistor Band 4 Band Codes 5 Band Codes 1 1st Digit 1st Digit 2 2nd Digit 2nd Digit 3 Multiplier 3rd Digit 4 Tolerance Multiplier 5 Tolerance Colour Digit Multiplier Black 0 1 Brown 1 10 Red 2 100 Orange 3 1 000 Yellow 4 10 000 Green 5 100 000 Blue 6 1 000 000 Violet 7 Grey 8 White 9 Gold 0 1 Silver 0 001 ...

Страница 63: ...2 167 205 0012 ASD with Sounder Strobe Mk3 SP0 OFF 0 115 8 321 ASD with Sounder Strobe Mk3 SP3 LOW 0 115 9 340 ASD with Sounder Strobe Mk3 SP3 MED 0 115 14 635 ASD with Sounder Strobe Mk3 SP3 HIGH 0 115 18 421 403 0006 403 0007 Manual Call Point Mk3 0 173 5 954 313 0001 313 0002 313 0003 Soundpoint Mk3 SP3 OFF 0 172 2 663 Soundpoint Mk3 SP3 LOW 0 172 3 615 Soundpoint Mk3 SP3 MED 0 172 8 046 Soundp...

Страница 64: ...lled correctly clipped or in containment All loop bases and back boxes installed and terminated All devices have positive core links in place Loop insulation and continuity testing complete and form filled out As wired drawing marked up showing cable runs and devices Configuration sheets completed with devices descriptions etc Control Panel backbox installed with 230V AC supply live tested and iso...

Страница 65: ...isfactorily All faults device input output EOL battery etc cleared from control panel Correct operation and device poll verified using Sita DIAGNOSTIC Step 2 Data Uploaded to PC Configuration set up on PC Data downloaded to control panel Addressable loop reconfigured System Reset All ancillary inputs and outputs connected and faults cleared Step 3 Correct operation of all input devices tested ie d...

Страница 66: ...stem CORE CONTINUITY READING OHMS LOOP 1 LOOP 2 LOOP 3 LOOP 4 LE1 ve to LE2 ve LE1 ve to LE2 ve LE1 Scrn to LE2 Scrn A reading of approximately 1 2 ohm per 100 metres of 1 5 mm 2 cable is expected and any significant variation from this should be investigated If the above readings are satisfactorily showing circuit continuity then you may also take the reading below CORE CONTINUITY READING OHMS LO...

Страница 67: ...E CONTINUITY READING OHMS Main Ring ve to ve ve to ve Screen to Screen A reading of approximately 1 2 ohm per 100 metres of 1 5 mm 2 cable is expected and any significant variation from this should be investigated If the above readings are satisfactorily showing circuit continuity then you may also take the reading below CORE INSULATION READING OHMS Main Ring ve to ve ve to Screen ve to Screen Scr...

Страница 68: ... which may have been operated or if a detector has been operated be sure that the cause of the alarm has been removed before resetting the system by pressing the RESET SYSTEM button at Access Level 2 User as above Following a Fault Condition The appropriate fault LEDs will illuminate The internal panel buzzer will sound To mute the internal panel buzzer press the SILENCE BUZZER button at Access Le...

Страница 69: ...ou may have accidentally set off the fire alarms then check the following If the fire alarm sounders within your area only are operating then check your own area for the cause of the alarm If this proves to be a false alarm due to dust cooking fumes steam cigarette smoke etc then clear the smoke from the area in order to allow the system to reset itself after a few minutes If this happens then no ...

Страница 70: ...ystem SITE DETAILS CONTROL PANEL NO DESCRIPTION LOOP NO DESCRIPTION DEVICE ADDRESS SERIAL NUMBER DEVICE DESCRIPTION ZONE DEVICE TYPE SMOKE MODE HEAT MODE ALARM CONF N Eg 1 35415 Gnd Flr Front Office 1 MPS SM2 HM2 NO SOUND PATTERN IN ALARM CONFIRMATION SOUND PATTERN IN ALARM ALARM CONFIRMATION DELAY TIME 1 5 MIN DEVICE TYPE OPTIONS MP MPS MCP MCPS IO CZM FP SP HP BELL SS ...

Страница 71: ...Quadnet Control Panel Engineering and Commissioning Manual 71 Your Notes ...

Страница 72: ...Quadnet Control Panel Engineering and Commissioning Manual 72 Your Notes ...

Страница 73: ...Quadnet Control Panel Engineering and Commissioning Manual 73 Your Notes ...

Страница 74: ...BD 12 DoP 507 0001 DoP 507 0009 EN54 2 1997 A1 2006 EN54 4 1997 A1 2002 A2 2006 507 0001 Intended for use in the fire detection and fire alarm Systems in and around buildings Essential characteristics Performance Operational reliability Pass Durability of operational reliability and response delay Temperature resistance Pass Durability of operational reliability Vibration resistance Pass Durabilit...

Отзывы: