background image

SETUP CONFIGURATION

The configuration jumpers and switches are located
inside the control box. To access them, open the
enclosure by first removing AC power to the control
box, remove the four screws which secure the cover
plate to the bottom plate, and then remove the top.
The circuit board is attached to the top cover.

Before using this setup procedure, the following must
be determined:

1. Line Voltage: 115 or 230 VAC?

2. Type of Measurement: Web width or edge posi-

tion?

3. Jog Direction: Which direction for each of the

push buttons?

4. Units to be Displayed:  Inches or millimeters?

5. Display Polarity: Directions corresponding to in-

creasing and decreasing measurements.

Refer to Figure 1 for the location of the jumpers and
switches referred to in the following procedure.

1. To configure the Pro-Trac 100 for 115 VAC or

230 VAC operation, install 16 or 18 AWG wire
jumpers on TB1 terminal block (located inside
the control box) as follows:

A. For 115 VAC operation, use one jumper on

TB1 from pin 4 to pin 5 and another jumper
on TB1 from pin 6 to pin 7.

B. For 230 VAC operation, use one jumper on

TB1 from pin 5 to pin 6.

NOTE:

Steps 2 through 5 describe the jumpers and switches
used to configure the operating parameters of the
Pro-Trac 100 control. These jumpers and switches
are located inside the control box.

Unless otherwise specified, the Pro-Trac 100 control
station will be configured at the factory as follows.:

A. Jumper JP1: “Web Width” position. Display

shows “Web Width.”

FIFE CORPORATION

Post Office Box 26508
Ok lahoma City, Ok lahoma 73126, U.S.A.
Phone: (405) 755-1600

Fax: (405) 755-8425

Telex: 747276

INSTALLATION INSTRUCTIONS

FIGURE 1

REV DATE 11-02-95

PRO-TRAC 100 CONTROL STATION

FIG. 1-596

SETUP CONFIGURATION

PAGE 1 OF 2

Отзывы: