L
V
Vapor
Liquid
Filter (optional)
Cylinder
Schrader Valve Core
Removal Tools (optional)
Sight Glass (optional)
27
26
(
Push/Pull Recovery
This method is only for larger systems with
at least 30 lbs of liquid refrigerant It’s used to
recover liquid before recovering vapor
1. Close valves of recovery cylinder and MR45.
2. Set up as shown in the diagram.
3. Open valves of liquid hose and removal tool at liquid system port.
4. To purge air from system liquid hose, briefly unseat hose fitting at
cylinder’s liquid port until vapor is seen.
5. Fully open liquid valve of recovery cylinder and allow to pressurize.
6. Set MR45 to RECOVER.
7. Press START to begin recovery.
8. Fully open vapor valve of recovery cylinder.
9. To purge air from hoses briefly unseat hose fitting at vapor system
port until vapor is seen.
10. Open valves of vapor hose and removal tool at vapor system port.
11. When liquid recovery is complete, press STOP to stop motor.
12. Close all valves and proceed to Direct Vapor Recovery (page 25).