9
Display Screens
The TDR 150 has 3 main display screens;
-
Startup Information screen
-
Data screen
-
Settings Menu screen
Startup Information screen
The Startup Information screen is displayed for
about 2 seconds after the display is turned on.
If desired, the startup screen can be kept on for a
longer duration. While powering up the meter,
press and hold the
On/Off/Back
button to contin-
ue displaying the Startup Device Information
screen. Release the button to proceed to the Data
screen.