Install the GSK-3 spillage switch on the draft hood with the self-
tapping sheet metal screw supplied. The thermal element disc
should hang just below the draft hood relief opening. (See
Figure 10)
8. Run the two (2) yellow wires from the break in the top of the
wiring harness into the spillage switch through the plastic
bushing opening and connect to the switch terminals.
9. Run the harness to the CK-41 junction box, which will be
mounted in a convenient location near the power venter. Use
clamps to support the wire harness to the joists at regular intervals to prevent sagging.
10. Run the low voltage wires into the control box (through hole with plastic bushing) and connect the wires as follows:
Connect the black wire to terminal T1, the red wire to T2, and the yellow wire to T3. (See Figures 11 and 12)
11. Follow the National Electrical Code and or applicable local codes for running high voltage wires to the CK-41 control
box an wire according to the diagram. Unit must be grounded. Check ground circuit to make sure the unit has been
properly grounded. Connect the flexible conduit from the blower to the control box and wire according to the diagram.
12. Attach the appropriate self-adhesive wiring diagram label to the water heater jacket.