© FAR GROUP EUROPE
EN
G : GASLEAK and FINALISATION OF INSTALLATION
• Put soapy water or bleed detector spray on the connector
• Be sure that no small bubbles appearead which indicated gas bleed.
G2- Second test :
• redo one more time this operation after switch on during one hour running
.
•If you do not have any escapes, you can finalize the installation.
G1-
First test
H : EMERGENCY SWITCH USE
B A LAYA G E
MA N U E L
A R R E T
MA R C H E
A N N U LAT IO N R E G LA G E
V E ILLE
V IT E S S E
V E N T ILAT E U R
F O N C T IO N S
I/O
MIN U T E R IE
V e i l l e
M a r c h e
M i n u t e r i e
V e i l l e
M a r c h e
M i n u t e r i e
V e i l l e
M a r c h e
M i n u t e r i e
•Only on the models which are equipped with it.
• If the remote control batteries are uncharged or the remote control has a fault, use the safety switch.
1
2
3
• Bind the assembly with the roll
of plastic film, using a tightening
force to keep it in firmly place.
• Block up the hole in the
wall with the mastic.
• et the two half-shells in place,
then finish the interior blocking
with the rest of the mastic.
G3- Finalisation of installation
112501-505-506-507-H.indd 51
10/02/06 8:11:54