© FAR GROUP EUROPE
E
F
EN
F : UNDER PRESSURE PROCEDURE
(except 112495: Gaz pre load model)
E
• Unscrew the 3 caps.
( flat keys 13 & 19 ) 55
1
2
E
F
• Unscrew the closing valve by one turn
(Allen screw).
3
4
E
F
• • Open the 2 valves completely using an
Allen hexagonal wrench.
E
F
G
• Put Teflon around the thread and screw the
3 caps. ( flat keys 13 & 19) 56 : First test
5
indoor outdoor unit and copper pipes of your split system are pre loaded, it’s not necessary to bleed
the gas . for each disassembling, gas stand inside the three parts of your air conditionner.
• Press on the valve and purge for 13
seconds maximum
G
E F
112501-505-506-507-H.indd 50
10/02/06 8:11:24