Fetco E1241IN-1B123-PM000 Скачать руководство пользователя страница 15

Go to fetco.com for the latest versions of all information         

Page 15

      

User Guide & Operator instructions

   

P212

e0

November 2021

 

(For Qualified Service Technicians Only) 

General:  

1.  If not installed correctly by qualified personnel, the brewer will not operate properly, and damage may result. 

2.  Utilize only qualified beverage equipment service technicians for service and installation. 

3.  Always have an empty dispenser under spray head of all coffee brewing equipment-including when at idle  

4.  Damages resulting from improper installation are not covered by the warranty and will void the warranty. 

Below are the key points to consider before installation: 

Electrical:  

1.  All CBS_Series brewers require 

an electrical ground wire

.  Installation without grounding is dangerous. 

2.  Note Equipotentiality Terminal, if present, (To identify the terminals which, when connected together, bring the 

various parts of equipment or of a system to the same potential, not necessarily being the earth (ground) potential, 

e.g. for local bonding.) 

3.  Verify voltages, polarity, circuits, and circuit breaker access before attaching equipment. 

4.  Brewers in this series wire differently in regard to a neutral wire.  Review the wire diagrams. 

5.  The electrical diagram is located in the User’s Guide and online at 

www.fetco.com

. 

6.  Make sure of the tight grounding of the equipment and use the external ground bolt. 

7.  The installation must comply with applicable federal, state, and local codes having jurisdiction at your location.  

Check with your local inspectors to determine what codes will apply. 

See wiring diagrams on pages 26 to 28 for connections 

Plumbing:  

1.  North America: All installations must comply with applicable federal, state, or local plumbing codes. 

2.  All Others:  The water and waste piping and connections shall comply with the International Plumbing Code, 

International Code Council (ICC), or to the Uniform Plumbing Code (IAPMO). 

3.  Install a backflow prevention device.  Most municipalities require a recognized backflow preventer 

Usable on all hot beverage and cold beverage equipment is a WATTS® SD-2 or SD-3.   
WATTS spring loaded double check valve models are accepted by most zoning authorities. 

The check valve should be as close to the water supply inlet of the beverage equipment as possible 

4.  All beverage equipment must use a water filter.  A finishing carbon filter is preferred 

5.  Install the filter unit after a water shutoff valve and in a position to facilitate filter replacement. 

6.  The water line and water filter must be flushed thoroughly prior to connecting it to the brewer to prevent debris from 

contaminating the machine, and flushed again with each replacement filter installed 

7.  Verify that the water line will provide a flow rate of at least 1½gpm/(5.7lpm) per minute and the water pressure is 

between 20-75 psig (138-517kPa) before making any connections 

8.  Only use the supplied factory fitting to attach water supply line to brewer (shipped in brew basket) 

9.  The suppled fitting is a 3/8” flare/compression fitting for ¼” supply line.  Other adaptors may be substituted. 

10. 

Hand tighten the factory fitting when connecting the stub on the brewer. This will reduce stress on the internal 

connections and reduce the possibility of leaks developing after the install has been completed 

 

Tank Drain 

The water tank must be drained before maintenance procedures, and when the unit is to be relocated or shipped. 

Drain is for service use only and must not be permanently connected.  NOTE: Never plumb a water line to the drain. 

1. 

Disconnect power and water to unit. DANGER: Ensure that all utility connections to the brewer are broken. 

2. 

Move the unit near a sink or obtain a container large enough to hold four gallons of water.   

Note:  The hot water tank may hold up to 4.5 gallons (CBS-1241 8.5 gal CBS-1242). 

3. 

Remove the front panel and tank cover and allow the tank to cool to a safe temperature 

4. 

The tank drain line and clamp are located inside-under the hot water tank.  Pinch the drain line clamp to close 

5. 

Locate the fill valve against the back wall, using pliers, loosen the hose clamp and move it back over the tube. 

Note Do not loosen the hose clamp to the bottom of the hot water tank  

6. 

Crimp the tube an inch or two away from the drain plug to prevent water from flowing and pull it off the valve.  

7. 

Pull the tube end out of the brewer and position over sink or bucket. 

8. 

Release the crimped tube and hose clamp and allow the water to flow into the sink or container. 

9. 

Reverse steps 4-8 when service is complete.  Ensure pinch clamp is open and hose clamps are in place. 

 
 
 
 
 

 

Brewer 

Hot Water Tank Capacity 

OPEN 

Leave open for use 

 

PINCH SHUT 

To drain tank & service brewer

 

AI

!

 

CBS-1241 Single 

4.5  gal 17 liter 

CBS-1242 Twin 

8.5 gal 32 liter 

Содержание E1241IN-1B123-PM000

Страница 1: ...ractor Plus Brewing System FETCO PLUS Commercial Beverage Equipment CBS 1242 CBS 1241 1 gallon Extractor Plus Brewers shown with 1 gallon L4D dispenser sold separately CONTACT INFORMATION FETCO FOOD E...

Страница 2: ...elay Weights and Capacities Model Height Width Depth Water tank capacity Empty Weight Filled Weight Shipping Weight Shipping Dimensions CBS 1241 Brewer 34 in 880 mm 11 in 300 mm 20 3 8 in 520 mm 4 5 g...

Страница 3: ...i on Phase Amp Dr aw Brew Volum e per hour E1241C E 1B130 PM000 230 1 X 3 0 kW L N PE 2 8 EU1 16P 1 12 5 7 7 gal 29 1 L CBS 1241PLUS Single 1 Gallon 3 0 4 0 Liter Coffee Brewers Field configurable Int...

Страница 4: ...rew basket 5 Select a batch hold the corresponding BREW button in for 1 second to start 6 STOP button will illuminate Countdown time will display Selected BREW button will flash to indicate brew is in...

Страница 5: ...3 Service Phone G15 Rt Brews A90 Copy Batch B13 Filter Life F14 Override Lt BBS See Page 12 A91 Copy Batch From F15 Override Rt BBS A92 PASTE To F16 Override Lt BBL F17 Override Rt BBL Left and Right...

Страница 6: ...brew time is 5 30 minutes A2 30 Prewet Perc 0 0 00 25 0 1 Percentage of total brew volume A2 40 Prewet Delay Brew pause after prewet completes 0 1 00 Min 0 10 5 00 1 00 min The time between prewettin...

Страница 7: ...mperature ft m Suggested Setting F Boiling point F Suggested Setting C Boiling point C 0 0 205 212 0 96 100 0 500 152 205 211 0 96 99 5 1000 305 200 210 1 93 98 9 2000 610 200 208 1 93 97 8 2500 762 2...

Страница 8: ...Activates valve Default is 10 sec Toggle OFF or ON Runs valve to verify flow NOTE Have container under brew basket D4 Rt right Brew Valve Test Press to test Activates valve Default is 10 sec Toggle OF...

Страница 9: ...te 1 85 liter minute 64 ounces minute 0 42 0 58 Gallons 1 55 2 20 Liters 53 74 fl ounces 0 01G 0 05L 1 oz Adjusts flow rate E6 LT Bypass valve flow rate 0 37 gallon minute 1 60 liters minute 47 ounces...

Страница 10: ...NO Follow prompts Saves settings Insert blank USB F9 Restore From USB Applies settings from USB Insert USB Will need reboot F10 Restore Defaults NO NO YES Reset to factory When selecting F10 RESTORE...

Страница 11: ...k did not refill within expected time Water supply flow rate is too low Watch for short potting during brew cycle Investigate cause of low flow rate Clogged water filter 200 Heating flatline Tank is b...

Страница 12: ...nt Totalized cycles of valve operation CBS 1241 CBS 1242 G29 A Rt Brew Cycles R G30 A Rt Brew Volume LT Right brew valve flow through volume Gallons Liters Totalized volume through right valve CBS 124...

Страница 13: ...toggle to the SAVE YES screen To SAVE and EXIT Press button 1 to SAVE your changes and EXIT Note Only the left side buttons of a two sided brewer are used for programming NOTE User Settings will be er...

Страница 14: ...such as URNEX TABZ DIP IT or Squeak n Clean 2 Carefully Follow the instructions supplied with the cleaning product 3 Never use spray cleaners solvent solvent based cleaner or petroleum based polish a...

Страница 15: ...ible 4 All beverage equipment must use a water filter A finishing carbon filter is preferred 5 Install the filter unit after a water shutoff valve and in a position to facilitate filter replacement 6...

Страница 16: ...nit warranty and may lead to electric shock or burn as well as damage to unit and or its surroundings 7 If the power cord requires repair or replacement it must be performed by the manufacturer or aut...

Страница 17: ...BB HANDLE 1023 00191 00 GREEN PLUG BB HANDLE 1023 00192 00 ORANGE PLUG BB HANDLE 1023 00180 00 BLUE PLUG BB HANDLE Stainless Steel Brew Basket Ref Qty Part Number Description B003218B1 Complete Stain...

Страница 18: ...sions of all information Page 18 User Guide Operator instructions P212e0November 2021 Parts Diagram CBS 1241 FETCO CBS 1241 Drawing Number 1101 00580 00 6 Part Number1102 00471 00 ELECTRICAL COMPONENT...

Страница 19: ...1 1046 00035 00 LABEL WARNING TO REDUCE RISK OF ELECTRIC SHOCK OR FIRE 31 1 1046 00003 00 LABEL CSD WARNING 1 5 X 5 0 32 1 1041 00033 00 BLACK EXTRACTOR PLUS LABEL LASER ENGRAVED 33 1 1402 00097 10 WI...

Страница 20: ...ions of all information Page 20 User Guide Operator instructions P212e0November 2021 Parts Diagrams CBS 1242 FETCO CBS 1242 Drawing Number 1101 00579 00 6 Part Number1102 00471 00 ELECTRICAL COMPONENT...

Страница 21: ...2232 42 28 1 1001 00409 00 COVER UPPER BASE CBS 2232 42 29 12 1082 00017 00 SCREW TRUSS HD PHIL MACHINE 6 32 X LG 30 1 1046 00035 00 LABEL WARNING TO REDUCE RISK OF ELECTRIC SHOCK OR FIRE 31 2 1046 00...

Страница 22: ...ATED 9 1 1107 00030 00 HEATER ASSEMBLY IMMERSION 1500W 120VAC 9 1 1107 00031 00 HEATER ASSEMBLY IMMERSION 1700W 120VAC 9 1 1107 00029 00 HEATER ASSEMBLY IMMERSION 2300W 120VAC 9 1 1107 00037 00 HEATER...

Страница 23: ...0 1084 00010 00 NUT HEX 6 32 UNDERSIZED ZINC PLATED 9 2 1107 00030 00 HEATER ASSEMBLY IMMERSION 1500W 120VAC 9 2 1107 00031 00 HEATER ASSEMBLY IMMERSION 1700W 120VAC 9 2 1107 00029 00 HEATER ASSEMBLY...

Страница 24: ...8 12 1084 00010 00 NUT HEX 6 32 UNDERSIZED ZINC PLATED 9 2 1107 00037 00 HEATER ASSEMBLY IMMERSION 2300W 240VAC 9 2 1107 00005 00 HEATER ASSEMBLY IMMERSION 3000W 240VAC 9 2 1107 00010 00 HEATER ASSEM...

Страница 25: ...1102 00113 00 SWITCH REED ASSEMBLY 5 1 1102 00479 00 ASSEMBLY CASCADE SPRAY DOME NEXT GEN ORANGE 6 2 1057 00076 00 VALVE ASSEMBLY COMPLETE NG DELTROL interchangeable with 1057 00078 00 6 2 1057 00078...

Страница 26: ...6 User Guide Operator instructions P212e0November 2021 Wiring Diagrams SSR SSR SKU E1231 US 1X117 Domestic Dual Voltage Brewer is supplied by factory as 120VAC For 208 240 volt application conn ect L1...

Страница 27: ...ons of all information Page 27 User Guide Operator instructions P212e0November 2021 S S R Wiring diagram 1401 00190 10 CBS 1241PLUS SKU E1241US 1A115 PM001 E1241US 1A123 PM002 E1241IN 1B123 PM000 E124...

Страница 28: ...ions of all information Page 28 User Guide Operator instructions P212e0November 2021 SSR Wiring diagram 1401 00196 10 CBS 1242 PLUS SKU E1242US 1B223 PM000 E1242US 1B230 PM000 E1242IN 1B223 PM000 E124...

Отзывы: