Fetco CBS-2041e Скачать руководство пользователя страница 2

 

Contact Information 

 

FETCO 

Food Equipment Technologies Company 
640 Heathrow Drive 
Lincolnshire 

 IL 

 60069 

 USA 

 

Internet: 

www.fetco.com 

Phone:

 (800) 338-2699 (US & Canada) 

             (847) 719-3000 

     Fax:

 (847) 821-1178 

 

Emergency Service Only:

 (800) 660-0035 (U.S. & Canada) 

 

Email:

 [email protected] 

           [email protected] 

 

Description & Features 

 
The CBS-2041 and CBS-2042 feature our patented intermittent spray over technology, which works like this: 
 
The following variables are programmed for each batch size: 
 

 

Brew volume 

 

Prewet percent (Percentage of the brew volume) 

 

 

 

Brew time 

 

Prewet delay (The time between prewetting and the brew cycle.) 

 

 

 

Bypass percent 

    (Percentage of the brew volume) 

 

Drip delay (The time between the end of the brew cycle 

     and the unlocking of the brew basket.) 

 
Using these variables, the software calculates how much water to use for prewetting, bypass, and brewing.  The 
total brew time is divided into several 30 second cycles. Within these cycles, the software calculates how long to 
spray water over the coffee grounds, and how long to pause before the next cycle begins.  The bypass valve opens 
at the beginning of the brew cycle and dispenses the correct amount of water all at once. 
 

Features 

 

 

Two fully programmable batch sizes per side 

 

Magnetic brew basket sensor 

 

Adjustable prewetting cycle 

 

Brew basket safety locks 

 

Adjustable bypass 

 

Brew temperature protection 

 

Electronically controlled hot water service 

 

 

Specifications 

Requirements 

 

Water Requirements:

 

 

Electrical: 

See electrical configuration chart.

 

            CBS-2041: 20-75 psig, 1 gpm 

 

            CBS-2042: 20-75 psig, 1 ½ gpm

 

 

Coffee Filters:

 

13” X 5 ”  FETCO Product # F002

 

 

Содержание CBS-2041e

Страница 1: ...ation and Brewing Efficiency 3 Dimensions Utility Connections 4 Installation 5 Operating Instructions 8 Programming 9 Batch Settings 9 Temperature Settings 10 Advanced Settings and Diagnostics 10 Relay Test 11 Error Codes 12 Service 13 Cleaning Maintenance 13 Wiring Diagrams 14 Parts 16 NOTICE TO INSTALLER This book contains important programming instructions that will be needed by the customer Pl...

Страница 2: ...the brew cycle and the unlocking of the brew basket Using these variables the software calculates how much water to use for prewetting bypass and brewing The total brew time is divided into several 30 second cycles Within these cycles the software calculates how long to spray water over the coffee grounds and how long to pause before the next cycle begins The bypass valve opens at the beginning of...

Страница 3: ...9 11 0 to 120 VAC or 120 220 4 1 18 1 9 9 11 0 120 208 240 VAC 120 240 4 7 19 7 11 0 11 0 CBS 2042 1 0 gallon per batch Electrical Heater Voltage Maximum Batches per Hour max 22 Config Code Configuration AC Phase Wires KW Amp draw Cold Water Hot Water E42016 2 X 3 KW 120 208 single 3 ground 4 6 22 4 11 5 22 0 120 220 5 1 23 7 12 9 22 0 120 240 6 1 25 8 15 4 22 0 Based on standard factory settings ...

Страница 4: ...4 Dimensions Utility Connections CBS 2041 CBS 2042 ...

Страница 5: ...ructions Brewer Setup 1 Review the Dimensions for the unit you are installing Verify that the brewer will fit in the space intended for it and that the counter or table will support the total weight of the brewer and dispensers when filled 2 The brewer s legs are shipped inside the brew baskets Remove the brew basket s and the coffee dispenser s Place the brewer on its back and screw in the legs 3...

Страница 6: ...e power terminal block Use only 10 gauge copper wire for grounding 6 Electrical connections must be secured in place within the unit to meet national and local standards 7 Finally connect the incoming power wires to the terminal block as shown in accordance with applicable codes CBS 2041 This model can be connected to 120 VAC or 120 208 240 VAC Factory Configuration 120 VAC 3 wires L1 L2 N GROUND ...

Страница 7: ...losely in the top of the brewer at the dispense fittings during this inspection Operator Training Review the operating procedures with whoever will be using the brewer Pay particular attention to the following areas 1 Always pre heat the dispensers before the first use of each day by filling them half way with hot water and letting them stand for at least 15 minutes 2 Don t remove the brew basket ...

Страница 8: ... STOP BREW CYCLE BREW LARGE PORTION BREW SMALL PORTION MAIN POWER INDICATOR LAMP PRESS AND HOLD FOR 1 SECOND TO START PRESS AND HOLD FOR 1 SECOND TO START Y Z X MAIN POWER SWITCH LOCATED UNDER FRONT PANEL DIRECTLY BEHIND FRONT LEG Brewing 1 Turn the main power switch and control panel switch on 2 Prepare a brew basket with the correct size filter and appropriate amount of coffee 3 Slide the brew b...

Страница 9: ...xt page MAIN POWER SWITCH IS BEHIND FRONT LEG DISPLAY ADVANCE TO NEXT PARAMETER SCROLL UP SCROLL DOWN SAVE CHANGES AND EXIT Important After programming you must press the HOT WATER button to save the settings and exit programming mode or changes will be lost You may exit programming at any time Batch Parameters X Batch Number 1 4 Parameter Name Range Increment Default Setting Comment X 0 Batch Ena...

Страница 10: ... water is touching probe 0 Tank is less than full 1 Tank is full 51 Water Resistance Water resistance ohms as read by probe 52 Brew Basket Sensor State left right 0 1 To test slide the brew basket in and out Display should toggle between 0 and 1 0 Brew basket in 1 Brew Basket out 53 Power Relay State 0 1 Checks power relay on control board To test press Control Panel Power Switch Display should to...

Страница 11: ...d S1 S2 S3 etc The hot water switch must be pressed last as this will exit the test 65 Relay Test 0 1 0 0 Skip relay test Loop back to 50 1 Relay test active Go to 90 Press to save the settings and exit Diagnostic mode Press again to exit Programming mode and return to Operating mode Relay Test Tests the individual relays which control various components Use either batch button to actuate the rela...

Страница 12: ...o low Watch for short potting during brew cycle Investigate cause of low flow rate Clogged water filter etc Press the control panel power switch Press the control panel power switch 101 Error on refill Tank did not refill within 2 minutes Water supply flow rate is too low Watch for short potting during brew cycle Investigate cause of low flow rate Clogged water filter etc Error message is cleared ...

Страница 13: ... off and on Service Utilize only qualified beverage equipment service technicians for service A Service Company Directory may be found on our web site http www fetco com Companies listed as Extractor Authorized stock parts for these models When changing the control board check the software version on the chip Example V2 11 If the chip on the replacement board has an older software version than the...

Страница 14: ...14 Wiring Diagrams CBS 2041 ...

Страница 15: ...15 CBS 2042 ...

Страница 16: ...1 CBS 2042 ITEM QTY PART NO DESCRIPTION 1 4 82112 8 X 3 4 PAN HD PHIL T S 18 8 S S SCREW 2 1 57047 COIL ASSY REPAIR KIT DSV 11 120 VAC 2 1 57071 COIL ASSY REPAIR KIT DSV 11 240 VAC EXPORT VERSION ONLY 3 1 57073 VALVE REBUILD KIT DSV11 4 1 102082 SPRAY HOUSING ASSY 5 1 24054 O RING 4 237 I D 156 6 1 102081 SPRAY PLATE ASSY 4 7 8 DIA ...

Страница 17: ...SERT 13 X 5 2 1 23117 BREW BASKET HANDLE BLACK 3 1 46011 WARNING LABEL 5 1 82096 HANDLE SCREW 8 1 57082 MAGNET NOT SHOWN F002 PAPER FILTERS 13 X 5 500 PER CASE COLOR BREW BASKET HANDLES PART DESCRIPTION 23106 BREW BASKET HANDLE GREEN 23107 BREW BASKET HANDLE ORANGE 23148 BREW BASKET HANDLE RED ...

Страница 18: ......

Отзывы: