background image

Installation 

(For Qualified Service Technicians Only) 

Keys To A Successful Installation 

If not installed correctly by qualified personnel, the brewer may not operate properly and damage may result.  
Damages resulting from improper installation are not covered by the warranty. 
Here are the key points to consider before installation: 
 

Electrical: 

™

 

All FETCO brewers require 

NEUTRAL

.  Ground is not an acceptable substitute.  Installation without neutral 

may cause damage to the electronic components. 

™

 

The power connection to L2 on the terminal block must be at least 105 volts.  Less than 105 volts will 
cause erratic behavior from the brewer. 

™

 

The circuit breaker is located on the bottom of the brewer. To reset it, push the button in and release. 

™

 

The electrical drawing for the brewer is located on the inside of the upper cover. 

 

Plumbing: 

™

 

This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes. 

™

 

The water line must be flushed thoroughly prior to connecting it to the brewer to prevent debris from 
contaminating the machine. 

™

 

Verify that the water line will provide at least ½  gallons per minute for the CBS-11H, and 1 ¼ gallons per 
minute for the CBS-12H before connecting it to the brewer. 

 

General: 

™

  Utilize only qualified beverage equipment service technicians for installation.  A Service Company Directory 

may be found on our web site, 

http://www.fetco.com

 
 

Installation Instructions 

 

Brewer Setup  

1.  Review the Dimensions for the unit you are installing.  Verify that the brewer will fit in the space intended 

for it, and that the counter or table will support the total weight of the brewer and dispensers when filled. 

2.  The brewer’s legs are shipped inside the brew baskets.  Remove the brew basket(s) and the coffee 

dispenser(s).  Place the brewer on its back and screw in the legs. 

3.  Place the brewer on the counter or stand. 
4.  When the brewer is in position, level it front to back 

and side to side by adjusting the legs. 

5.  Remove the lower cover to access the water and 

electrical connections.  Knock-outs are provided in the 
back and base of the brewer body for the connections. 

 

Water Connection

 

1.  Water inlet is a 3/8 inch male flare fitting. 
2.  The brewer can be connected to a cold or hot water line.  Cold water is preferred for best coffee flavor, but 

hot water will allow for faster recovery times. 

3.  Install a water shut off valve near the brewer to facilitate service.  If an in-line water filter is used, it should 

be installed after the water shut off valve and in a position to facilitate filter replacement. 

4.  Flush the water supply line and filter 

before

 connecting it to the brewer. 

5.  Verify that the water line will provide at least ½ gallons per minute for the CBS-11H, and 1 ¼ gallons per 

minute for the CBS-12H, and that the water pressure is between 20 and 75 psig. 

6.  Use a wrench on the factory fitting when connecting the incoming water line. This will reduce stress on the 

internal connections and reduce the possibility of leaks developing after the install has been completed. 

 

             

Warning: Legs are to be adjusted for 

                  leveling the brewer only.  Do not use 
                  for height adjustment or extend them 
                  higher than necessary. 

Содержание CBS-11H

Страница 1: ...S 1000 Series Coffee Brewers Table of Contents Contact Information 2 Product Description Features 2 Technical Data 2 Brewing Specifications 2 Weights and Capacities 2 Electrical Configuration and Brew...

Страница 2: ...lite servers and Total serviceability from the front warming stands Guard protected gauges and faucets Hot water service Self locking container bottoms Can be added at any time Technical Data Brewing...

Страница 3: ...5 0 11 0 C11041 1 X 4000 watt 120 208 1 ph 3 ground 3 2 15 7 5 0 11 0 120 220 1 ph 3 ground 3 7 17 1 5 8 11 0 120 240 1 ph 3 ground 4 2 18 0 6 6 11 0 CBS 12H 1 5 gallons per batch Electrical Heater V...

Страница 4: ...4 Dimensions Utility Connections CBS 11H CBS 12H...

Страница 5: ...installing Verify that the brewer will fit in the space intended for it and that the counter or table will support the total weight of the brewer and dispensers when filled 2 The brewer s legs are shi...

Страница 6: ...t water tank will begin filling until the water is sensed by the probe at the top of the tank 5 The heaters will be disabled by the control board until the tank is full 6 The brewer will be ready for...

Страница 7: ...he sight gauge tube CAUTION both the coffee or water may still be hot enough to cause burns so be careful when draining the dispensers 4 Place the dispenser s in position under the brew baskets Ensure...

Страница 8: ...ispensed and the water level drops below the probe a fill signal is sent to the fill valve If no water is sensed by the probe after 40 seconds the voltage to the thermostat and the heaters is removed...

Страница 9: ...disc above the spray cutter The standard hole in the flow disc is 240 Other flow discs are available for special situations like high levels of by pass The sprayhead can be assembled incorrectly duri...

Страница 10: ...ve the dispense tube 1 Unscrew seal locknut and release the drive screw from dispense tube shaft 2 Turn the dispense tube slightly back and forth while pushing the tube into the hot water tank until i...

Страница 11: ...to lower the tank temperature Wait for the ready light to come on and measure the temperature again Repeat until the desired temperature is obtained Effective April 1 2004 A new digital thermostat an...

Страница 12: ...setting of the dial before making any adjustments Turn the knob clockwise to increase and counter clockwise to decrease the timer setting On the dual portion timer the knob labeled T1 controls the fu...

Страница 13: ...ct with the coffee grounds The bypass can be adjusted from 0 to 33 of the total brewing water Dual brewers CBS 12H have separate bypass valves on each side Unless requested at the time of order all br...

Страница 14: ...ont 2 11 12 71036 Faucet C ring for retaining faucet union nut 3 11 12 102019 Faucet Shank assy 1 5 gal container 4 11 12 13015 Faucet Shank Locknut 1 5 gal container 5 11 12 71025 Sight glass vented...

Страница 15: ...04 Brew handle Screw 6 32 x 5 8 ss r h 44 11 12 82018 Brew handle Screw 8 32 x 2 ss r h 44 11 12 13005 Brew handle Safety Handle 44 11 12 102010 Brew handle start stop assy 44 11 12 002036 Brew handle...

Страница 16: ...2 52001 Terminal block mounting track 76 11 12 102040 Terminal block assy 2 pole export 120v 11 51 s 76 11 12 102041 Terminal block assy 3 pole 76 11 12 52002 Terminal block only requires mouting trac...

Страница 17: ...Brew Basket Wire insert 13x5 ice tea 1 2 batch 87 11 12 101063 Warmer assy upper cover optional 2 x 100w 120v 88 11 12 101080 Warmer assy Up 2x100w 220vac export 88 11 12 53032 Warming plate assy 100w...

Страница 18: ...rate is too low or fluctuates too much to support a full brew problem is worse in simultaneous brews Make sure brewer has a dedicated water line Ensure that the shut off valve is open all the way Nev...

Страница 19: ...e to see if it leaks water to the tank Coffee tastes too strong Incorrect dosage Measure and confirm the correct amount of coffee required Short brew levels See Short brew levels above Temperature Pro...

Страница 20: ......

Отзывы: