background image

Go to fetco.com for the latest versions of all information         

Page 9                                                   

P169  MARCH 2018   

 

 

-FOR OPERATOR SAFETY 

 

-This appliance is for commercial use only.  Commercial cooking equipment may be unsafe for household use 
-This appliance is intended for stationary indoor use.  Install and service by professional personnel only.   
-Change brewer to Manual Mode if in Automatic Mode to use the Pourover option 
-Pour in water only.   Brewer is designed for brewing 64 fl.oz/1.8 L of coffee or tea. 
-Do not press START if in Manual Mode 
-Brewer exterior and carafe warmers are hot- keep hands and other items away. 
-Hot water in tank is 200°F do not move commercial coffee brewers once installed due to spillage.  
- Allow brew to complete, usually five minutes, before removing brew basket from the brewer.  
-WARNING-brew basket contents are hot-use care!   
-WARNING-Hot Water Service Tap delivers very hot water.  It is intended for individual serving use. 
-Do not immerse the brewer in water or any other liquid 

 

CLEANING AND BREWER CARE 

 

Cleaning the Brewer

:   

 

Always empty brew basket and rinse after brewing, rinse decanter, inside and out.  

 

Wipe down both warmer plates and surrounding area with a wet clean cloth as required and 
whenever spills are present.  

 

Heat transfer from warmer plates is most efficient when decanter and warmer plate surface are 
clean—use only soap and water. 

 

Never clean brewer or glass surfaces with scouring powders or harsh implements. 
Always use a non-abrasive pad, or a wet clean cloth  

 

Never use solvents on plastic components—especially cleaners formulated with the solvent 
diethylene glycol  butyl ether (DGBE) 

 

Cleaning the Spray Head

 

Remove spray head, [DANGER 

SPRAY HEAD 

MAY BE HOT] use a towel or heavy gloves to prevent 

burning and cleaned with a brush. 

 

When cleaning the spray head, make sure that each hole is completely free of mineral deposits. 

 

Weekly spray head cleaning may be necessary in areas with extremely hard water. 
Monthly may be sufficient in areas which do not have excessive water hardness. 

 

Cleaning the Brew Tube

   

 

Using the FETCO 18” 1085.00012.00 Descaling Spring: 

 

Remove spray head - use a towel or heavy gloves to prevent burning as spray head may be hot. 

 

Insert descaling spring for at least 2/3 of its length and reciprocate back and forth, then remove.  
Wipe off spring and repeat. Continue until spring is clear. 

 

Cleaning frequency depends on use or water conditions.  We recommend this weekly or monthly-as 
required. 

 

WATER QUALITY 

 

Optimal water quality brews the best coffee.  The brewer also operates with less maintenance by 
using low mineral water.  Optimal water hardness between 125-250tds 

 

Always use a water filter or a reverse osmosis system for all beverage service 
 

Содержание C212103 ZURICH TS

Страница 1: ...net www fetco com Phone 800 338 2699 US Canada 847 719 3000 Fax 847 719 3001 Email sales fetco com techsupport fetco com P169 NEW MARCH 2018 TABLE OF CONTENTS SPECIFICATIONS 2 DESCRIPTION FEATURES 2 ELECTRICAL CONFIGURATIONS 2 WEIGHTS AND CAPACITIES 2 OPERATION AND MAINTENANCE 3 PLUMBING 3 ELECTRICAL 3 COFFEE BREWING 3 BREWING IN AUTOMATIC MODE 4 CONTROLS LAYOUT AND ICON DEFINITIONS 4 INFORMATION ...

Страница 2: ...2104 None 230 2 02 8 6 CEE7 7 Schuko C212114 Two 230 2 02 8 6 CEE7 7 Schuko C212104UK None 230 2 02 8 6 BS 1363A UK C212114UK Two 230 2 02 8 6 BS 1363A UK For 64 fl oz 1 8 L Automatic Allow approximately five minutes total brew time with final drip out In Manual Mode Allow approximately four minutes pour in time with brew one minute drip time Weights and Capacities Dispenser Model Height Width Dep...

Страница 3: ...o the brew rails of the brewer 3 Slowly manually fill the tank with room temperature water through the opening on the top cover until water starts running in a steady stream from the brew basket 3 pots or 192 fl oz The slight overflow indicates that the tank is full and is primed for brewing 5 Allow the brewer to heat up to full temperature indicated by the READY icon on front panel Slight drippin...

Страница 4: ...BREW STARTED SCREEN 1 Brewer is ready to brew Press START icon box 2 Brew started time is displayed Full Batch icon flashes Outer frame for Full Batch icon is hidden 3 Brew is proceeding STOP icon disappears carafe flashing to show that brew is in progress 4 Brewer is in drip delay mode 90 seconds time out Carafe icon steady Outer frame flashes to show drip out Final Screens SCREEN 5 HEATING indic...

Страница 5: ...r AUTOMATIC or MANUAL water inlet valve disabled in MANUAL fill Mode Automatic attached to water supply for self fill and brew Brew is timed and selectable for full or half batch ACCESSORIES left side of the screen UPPER LOWER WARMERS Touch icon to turn warmer ON OFF FULL HALF BATCH BREW Touch icon to toggle from full to half batch brew volume in AUTO Mode HOT WATER SERVICE BUTTON Enabled in AUTO ...

Страница 6: ...ourover manually operated feature Press NEXT to go to second programming screen OR press exit to save settings leave Pressing the middle tab toggles the brewer to MANUAL pour in mode Touch top left tab to return controls to AUTOMATIC mode SECOND SCREEN Tank temperature units Touch the or box to toggle from degrees Celsius or Fahrenheit Press NEXT to go to third programming screen OR press exit to ...

Страница 7: ...old top left box down Do not release finger during flow test Flow automatically ends in 1 minute Release immediately after 1 min test Carefully accurately measure the contents in receiving container Note If ERROR displays restart brewer to clear error Press NEXT to go to the ninth programming screen to enter this amount OR press EXIT to save settings leave NINTH SCREEN Flow Rate Input calibration ...

Страница 8: ...ement it must be performed by the manufacturer or authorized service personnel with the specified cord only from the manufacturer in order to avoid a hazard 9 The appliance must be disconnected from its power source during service and when replacing parts During service an operator must be able to check from any position that the plug remains removed If this is not possible an electrical disconnec...

Страница 9: ...armer plates is most efficient when decanter and warmer plate surface are clean use only soap and water Never clean brewer or glass surfaces with scouring powders or harsh implements Always use a non abrasive pad or a wet clean cloth Never use solvents on plastic components especially cleaners formulated with the solvent diethylene glycol butyl ether DGBE Cleaning the Spray Head Remove spray head ...

Страница 10: ...erature probe Probe failure 51 Open temperature probe or circuit Probe failure bad connection 100 Initial fill error when 10 minutes fill time Water supply rate too low Toggle Off On 101 Refill error if not filled in 5 minutes time Water supply rate too low or is off 102 Unwanted fill error Possible leak in tank or water connection 201 Heater open temp rise 2 in 10 minutes Bad heater open one shot...

Страница 11: ...58 00 SCREW 8 32 X 5 8 FLAT HD PH 18 8 SS 20 1 1112 00420 00 WELDMENT SPRAY CUTTER TUBE FITTING CBS 2121 21 1 1084 00041 00 HEX NUT 7 16 20 x 1 8 THK 22 1 1005 00028 00 WELDING DOME SPRAY CUTTER 6 HOLES CBS 2121 23 1 1025 00125 00 TUBE 1 2 OD X 3 8 ID X 9 375 LG 24 1 1023 00260 00 BODY FILL TOP TANK CBS 2121 25 1 1024 00097 00 FILL TUBE CBS 2121 AUTOMATIC 26 1 1024 00091 00 VENT TUBE CBS 2121 27 1...

Страница 12: ...Go to fetco com for the latest versions of all information Page 12 P169 MARCH 2018 Electrical Wiring Diagrams ...

Отзывы: