18
EAA
GB
EW/DW TURBO/M >> EW/DW TURBO/A (UBS EAA-
MA: 495891)
Modification:
pneumatically operated slides re-
place manual slides.
The complete floor group (the mechanically operat-
ed slides, vacuum connections and compressed air
connections) must be replaced. In addition, sole-
noid valves must be fitted, the compressed air mod-
ule adapted and wiring harnesses for the electron-
ics replaced.
Note:
only trained and qualified elec-
tricians are authorised to perform this work!
7
Assembly
Germany only:
Festool offers you the opportunity to
have the energy box or the boom arm assembled by
an authorised fitter. The energy box or boom arm is
assembled completely and handed over ready to
use. We recommend using this service for quicker,
more reliable assembly.
There are three different mounting options for the
EAA:
1. Attachment to a boom arm (ASA CT/SRM 2500,
ASA CT/SRM 5000, ASA TURBO 5000, ASA CT/
SRM 6000, ASA TURBO 6000): the required as-
sembly set is included with the boom arm.
2. Wall mounting: an additional assembly set is re-
quired (EAA-W: 495889).
3. Ceiling installation via bracket: an assembly set
is required (EAA-D: 495899).
7.1
Attachment to Festool boom arm
The energy box may only be used in combination
with a Festool boom arm ASA with joint (see Fig.
[4]
). If you have an older boom arm with a previ-
ous model of joint, use conversion kit 489704.
The assembly set is included in the ASA scope of
delivery and contains:
– Aluminium pipe for suspending the EAA
– Ready assembled mains cable and control line
with international standard interface
– Compressed air line
– 2 x protective sleeves
– 3 x cable clips
– 2 x hose hooks
Procedure
Mount the boom arm on a wall or pillar. Read
the operating manual supplied with the boom
arm.
The aluminium pipe is 1.6 m in length on deliv-
ery. The pipe can be shortened at the open end
if necessary. We recommend adapting the
length of the pipe so that the tool holder
[1-1]
on the EAA is positioned at forehead height.
Al-
ways deburr the aluminium pipe after cutting
to length!
Remove the rear panel of the EAA.
Grease the bottom section of the aluminium
pipe and slide into the Y-piece on the EAA
[5-8]
up to the stop.
Tighten the two screws
[5-9]
on the gripper
clamp to a tightening torque of 6 Nm. The EAA is
now seated securely on the aluminium pipe.
Skip to chapter 8 "Connections in the EAA".
7.2
Wall mounting
The assembly set contains:
– Cable set (mains power and control cable, 4 m
long)
– Compressed air line (4 m long)
– Aluminium pipe (50 mm in diameter, 350 mm
long) for suspending the EAA
– 2 x retaining plates, incl. screws and dowels
– Pipe/Suction hose adapter
– Mounting plate for maintenance unit
– Drain hose for condensate
Procedure
Remove the maintenance unit
[2]
from the rear
panel of the EAA (not EW version).
Remove the rear panel of the EAA.
Secure the mounting plate
[6-4]
to the top sec-
tion of the EAA using the four screws
[6-3]
.
Attach the maintenance unit
[6-1]
to the mount-
ing plate
[6-4]
using the screws
[6-6]
.
Attach the enclosed air hose
[7-1]
with screw
clamp
[7-2]
to the elbow piece with hose con-
nector
[7-3]
on the maintenance unit.
Cut the blue fitted air hose (D16 mm)
[8b-3]
to a
total length of 400 mm.
Turn the elbow piece
[6-5]
downwards and in-
sert the shortened blue air hose.
Attach the condensate drain hose
[5-11]
to the
connection point
[6-2]
on the maintenance unit.
Lay the hoses inside the EAA as shown in
Fig.
[5]
.
WARNING
Risk of injury, damage to property
Before installing the unit, have a structural engi-
neer check the static conditions of the planned
attachment point!