© Festo Didactic 655633
83
The stations of the MPS
are generally delivered
•
completely assembled
•
operationally adjusted as single station
•
commissioned
•
tested
Note
If stations are combined changes of the mechanical set-up and the position and
setting of sensors may be necessary.
The commissioning is normally limited to a visual check to ensure correct tubing
connections / wiring and supply of operating voltage.
All components, tubing and wiring is clearly marked so that all connections can be
easily re-established.
The following is required to commission the MPS
station:
•
The assembled and adjusted MPS
station
•
A control console
•
A PLC board
•
A power supply unit 24 V DC, 4.5 A
•
A compressed air supply of 4 bar (400 kPa), approx. suction capacity of 50 l/min
•
A PC with installed PLC programming software
6.
Commissioning
6.1
Workstation
Содержание MPS Station
Страница 1: ...655633 de en 07 18 R2 6 Station Handhaben Handbuch Handling station Manual CD ROM included ...
Страница 14: ...3 Technische Daten 14 Festo Didactic 655633 ...
Страница 16: ...4 Transport Auspacken Lieferumfang 16 Festo Didactic 655633 ...
Страница 26: ...5 Aufbau und Funktion 26 Festo Didactic 655633 ...
Страница 52: ...6 Inbetriebnahme 52 Festo Didactic 655633 ...
Страница 54: ...7 Wartung 54 Festo Didactic 655633 ...
Страница 58: ...Aktualisierungen 58 Festo Didactic 655633 ...
Страница 66: ...1 Introduction 66 Festo Didactic 655633 ...
Страница 68: ...2 Notes on safety 68 Festo Didactic 655633 ...
Страница 70: ...3 Technical data 70 Festo Didactic 655633 ...
Страница 72: ...4 Transport Unpacking Scope of delivery 72 Festo Didactic 655633 ...
Страница 82: ...5 Design and function 82 Festo Didactic 655633 ...
Страница 108: ...6 Commissioning 108 Festo Didactic 655633 ...
Страница 110: ...7 Maintenance 110 Festo Didactic 655633 ...
Страница 114: ...Updates 114 Festo Didactic 655633 ...
Страница 115: ......