4. Commissioning
4−17
Festo P.BE−CPX−CMA X−SYS−EN en 0908NH
4.5.1
Defining the operating mode with CCON
Operating mode
Description
Record select operating mode
Record select mode
(OPM1 = 0; OPM2 = 0)
The PLC selects a record from a record list stored in the CMAX.
A record contains all the parameters which are specified for a posi
tioning job. The record number is transferred to the cyclical I/O data
as the setpoint or actual value.
Direct operating mode
Direct mode
(OPM1 = 1; OPM2 = 0)
The positioning job is transferred directly into the cyclical I/O data.
The most important setpoint values (position, speed, force) are
transferred here. Supplementary parameters (e.g. acceleration) are
defined via parameterisation.
Commissioning operating
mode
(OPM1 = 0; OPM2 = 1)
Commissioning functions (e.g. identification) can be executed and
parameters read or written. Positioning jobs are not possible.
Parametrising operating
mode
(OPM1 = 1; OPM2 = 1)
A parameter is transferred into the I/O data according to the FPC
protocol. Positioning jobs are not possible.
Tab.4/2: Overview of CMAX operating modes
CCON
All the statuses which must be available in all operating
modes are controlled with control byte 1 (CCON).
Allocation of the control byte CCON (byte 1)
CCON
B7
OPM2
B6
OPM1
B5
LOCK
B4
B3
RESET
B2
BRAKE
B1
STOP
B0
ENABLE
Operating mode
selection
Software
access
blocked
Acknow−
ledge
malfunc
tion
Release
brake
Stop
Enable
drive
SCON
Status byte 1 (SCON) signals the status of the CMAX in all
operating modes.
Allocation of the status byte SCON (byte 1)
SCON
B7
OPM2
B6
OPM1
B5
FCT_MMI
B4
24VL
B3
FAULT
B2
WARN
B1
OPEN
B0
ENABLED
Acknowledgement of
operating mode
Device
control
software
Load
voltage
applied
Malfunc
tion
Warning
Oper
ation
enabled
Drive en
abled
Содержание CPX-CMAX-C1-1
Страница 2: ......
Страница 22: ...Contents and general safety instructions XX Festo P BE CPX CMAX SYS EN en 0908NH...
Страница 23: ...CMAX system overview 1 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 1...
Страница 31: ...Fitting and pneumatic installation 2 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 2...
Страница 60: ...2 Fitting and pneumatic installation 2 30 Festo P BE CPX CMAX SYS EN en 0908NH...
Страница 61: ...Electrical installation 3 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 3...
Страница 79: ...Commissioning 4 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 4...
Страница 122: ...4 Commissioning 4 44 Festo P BE CPX CMAX SYS EN en 0908NH...
Страница 123: ...Diagnostics and error handling 5 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 5...
Страница 163: ...Technical appendix A 1 Festo P BE CPX CMAX SYS EN en 0908NH Appendix A...
Страница 176: ...A Technical appendix A 14 Festo P BE CPX CMAX SYS EN en 0908NH...