
TEMPRA 24
5
N.B. - The gas pressures at the burner and gas fl ows during the central heating phase given in the table refer
to nominal boiler output. To reduce this output (where necessary), gas pressure must be reduced until the
required output level is reached (see fi gures 4 and 5).
• Maximum working temperature for central heating fl ow: 85°C
Technical Data
Gas supply
Pmax
Pmin
Nominal Heat Input (Net)
Nominal Heat Output
Output
Pmax
Pmin
kW
23,3
9,7
kW
25,8
11,2
Dimensions, weights, fittings
Depth
mm
272
Width
mm
460
Height
mm
760
Hot water capacity
litres
1,5
Expansion vessel pre-fill pressure
bar
1
Expansion vessel capacity
litres
8
Minimum central heating operating pressure
bar
0,8
Maximum central heating operating pressure
bar
3
Maximum central heating operating temperature
°
C
90
Index of protection
IP
44
Power supply
Power supply voltage/frequency
V/Hz
230/50
Max Power Absorbed
W
125
C.H. return (with isolation valve fitted)
mm
22
C.H. flow (with isolation valve fitted)
mm
22
Gas system fittings (with isolation valve fitted)
mm
22
Weight with packaging
kg
35
Central heating
Natural gas rate (G20)
nm3/h
2,73
1,19
Main injectors, Natural Gas (G20)
mm
12 x 1.3
Burner pressure, Natural Gas (G20)
mbar
11,8
2,5
Supply pressure, Natural Gas (G20)
mbar
20,0
LPG gas rate (G31)
kg/h
2,00
0,87
Main injectors, LPG (G31)
mm
12 x 0.77
Burner pressure, LPG (G31)
mbar
36,0
7,0
Supply pressure, LPG (G31)
mbar
36,0
Safety valve
bar
3