TEMPRA 24
12
Ø3/4"
Ø1/2"
Ø3/4"
200
Ø118
165 min
65
21 min
5 min
183 min
295.5 min
200 min
932 min
269
110
125 min
280
1
2
3
3.01 Drilling Template (Top Flue Application) (Standard Top Flue Application)
Select suitable mounting position for boiler, using the template mark fl ue outlet and boiler mounting
points. Drill two 10mm holes 70mm deep to accept the wall plugs. Fit standard wall plugs on the left and
right side and the special wall plug in the middle (fi g. 10a). Fix the wall bracket to the wall using standard
lock nut (M8) on both sides. Mount the boiler on the wall bracket as described in the fi g. 10a. Using a core
drill cut a 118mm diameter hole for the fl ue
.
1.
CH
flow
2.
Gas supply
3.
CH
return
Fig. 10b
Fig. 10a