BOX CONTENTS
2 x M6 16 mm screws
1 x hex key 4 mm
1 x cabinet
1 x shelf
1 x u-formed stabiliser
1 x legs
2 x wall-safety set
(M6 16 mm screws x 2)
4 x M8 16 mm screws
1 x hex key 5 mm
2 x rubber pads
1
NEEDED IN ORDER
TO ASSEMBLE
Min. two people
Spirit level
2
NB!
Screws and rawlplugs
are not inlcuded, as
different kinds of
walls require different
rawlplugs/screws.
2 x rawlplugs
2 x screws
The Haze Sideboard is made with thin, powder coated steel plates.
The hinge on the doors are welded to the frame, which means that
adjustment is only possible by regulating the height of the feet.
When mounting the Sideboard, please ensure that the cabinet is
level in all directions by adjusting the height of the feet.
If the doors are not totally aligned, mount the wall bracket accord-
ing to the instruction manual, but please make sure to not tighten
the screws completley. Then push gently on the side of the cabinet
where the door is lower than the other. When the doors are aligned,
tighten the wall brackets completely while still applying pressure to
the side of the cabinet.
Adjust the feet according to the new position of the cabinet.
Before pushing on the side of the cabinet, it is recommended that you
fill it with the items that you have planned to store in it. This is in order
to apply some weight to the cabinet, which can also affect the
alignment of the doors.
Power drill
Screw driver
Pencil
WARNING
Содержание HAZE FERM-1104263107
Страница 1: ...HAZE SIDEBOARD ASSEMBLY MANUAL...
Страница 5: ...fermliving com...