
13
FALCON
INDUSTRIE
3.01 Drilling Template (Top Flue Application)
Select suitable mounting position for boiler, using the template mark flue outlet and boiler mounting points. Drill two
10mm holes 90mm deep to accept the wall plugs, fit wall plugs. Fit two special wall plugs on the wall as described in the
fig. 13a. Fasten the wall bracket to the wall using an antitheft nut on the right side and a standard nut (M8) on the left side.
Mount the boiler on the wall bracket and fix using an antitheft nut on the left side and a standard nut (M8) on the right side.
Using a core drill cut a 118mm diameter hole for the flue.
1.
CH flow
2.
Safety Valve
3.
Domestic hot water outlet
4.
Gas supply
5.
Domestic hot water inlet
6.
CH return
Fig. 13b
15 min
5 min
Ø
1
18
195.5
215
400
15 min
Ø3/4''
Ø3/4''
Ø1/2''
Ø1/2''
Ø1/2''
Ø1/2''
101.5
380
200 min
219 min
909 min
204.5 min
1
3
2
4
5
6
20
360
Fig. 13a