Feniex Industries, Inc.
1.800.615.8350 /
feniex.com
5
■
Mounting Option 1: Bezel
1. Place the Down Lux Surface Mount
between the bezel and rear gasket.
2. Place against the intended mounting
surface and mark the holes for drilling.
3. Mark the areas where the mounting
holes will be drilled. If the mounting surface
is part of the vehicle, make sure no vital
components could be damaged by the
drilling process. There is an installation
template available at feniex.com.
4. Drill the mounting holes in the marked
surface. If wires need to pass through
the vehicle, drill a 0.5” diameter hole for
wire passage. Make sure to deburr holes
thoroughly.
5. Pass the wires through the 0.5” diameter
hole and secure the Surface Mount with
bezel and gasket to the mounting surface
using the factory provided screws (ensure no
vital components are damaged when drilling
holes for the surface mount).
■
Mounting Option 2: No Bezel
1. Place the large bolt (part #1) in the rear of
the control, as shown in the diagram.
2. Secure the bolt by placing the bracket
(part #2) over the bolt so the bracket is f lush
with the gasket.
3. Secure the bracket and bolt to the rear
of the gasket with the two factory provided
screws (part #3).
4. Mark the areas where the mounting
holes will be drilled. If the mounting surface
is part of the vehicle, make sure no vital
components could be damaged by the
drilling process.
5. Drill two mounting holes on the mounting
surface, making sure no vital components of
the surface are damaged.
6. Using customer provided screws, secure
the Down Lux to the mounting surface.
2A Fuse
MOUNTING
Mounting
option 1
Mounting
option 2