
84
OPERATION
18.7 Electronic power lift con-
trol / double action operation
(EPC/DA)
The EPC power lift can be switched to double-
acting (DA) mode.
DA mode is then operated directly with the
crossgate lever.
Operation_Pic_number:1
Switching from EPC to DA.
●
Lower the lifting gear (if an implement is atta-
ched).
●
Move crossgate lever into floating position
(see OPERATION Fig. 183).
●
Move the selection lever to DW (DA).
Switching back from DA to EPC.
●
Lower the lifting gear fully.
●
Move crossgate lever to floating position.
●
Move the selection lever to EPC (EHR).
●
Unlocking the EPC (see OPERATION Sec-
tion 18.2).
DANGER:
Lower all implements mounted on
front and back.
Before switching to DA operation,
disconnect implements on 2nd rear
connector (blue) and multi-coupler.
Otherwise, undesired movements of
the implement, front loader and rear
power lift could occur.
When power lift is used for repair
work, e.g. changing tyres, the tractor
must be propped.
Fig.180
Function indicators in DA operation
Operation_Pic_number:1
Indicator (A) appears.
Operation_Pic_number:1
Indicator (A) appears.
Operation_Pic_number:1
Operating the power lift in DA mode.
A
= Raise
B
= Lowering or exerting pressure
C
= Floating position
NOTE:
Use ground-working implements in 'floating
position' only.
Fig.181
Fig.182
Fig.183
Содержание 916 Vario
Страница 1: ...OPERATING MANUAL FENDT 916 Vario 920 Vario 924 Vario 926 Vario 930 Vario 930 000 000 014 Englisch ...
Страница 8: ...8 NUMERICAL INDEX ...
Страница 172: ...172 CARE AND MAINTENANCE ETWiring diagram 22 3 Power supply UB 930 900 000 004 Sheet 2 ...
Страница 173: ...173 CARE AND MAINTENANCE ETWiring diagram 22 4 Grounding layout 930 900 000 004 Sheet 3 ...
Страница 174: ...174 CARE AND MAINTENANCE ETWiring diagram 22 5 Starter control 930 900 000 004 Sheet 4 ...
Страница 175: ...175 CARE AND MAINTENANCE ETWiring diagram 22 6 Cold start system 930 900 000 004 Sheet 5 ...
Страница 177: ...177 CARE AND MAINTENANCE ETWiring diagram 22 8 STVZO lighting Sheet 1 930 900 000 004 Sheet 7 ...
Страница 178: ...178 CARE AND MAINTENANCE ETWiring diagram 22 9 STVZO lighting with horn Sheet 2 930 900 000 004 Sheet 8 ...
Страница 179: ...179 CARE AND MAINTENANCE ETWiring diagram 22 10 Turn signal system 930 900 000 004 Sheet 9 ...
Страница 181: ...181 CARE AND MAINTENANCE ETWiring diagram 22 12 Wipers and rotating beacon 930 900 000 004 Sheet 11 ...
Страница 182: ...182 CARE AND MAINTENANCE ETWiring diagram 22 13 Work lamps front EPC lighting 930 900 000 004 Sheet 12 ...
Страница 183: ...183 CARE AND MAINTENANCE ETWiring diagram 22 14 Rear work lamps 930 900 000 004 Sheet 13 ...
Страница 184: ...184 CARE AND MAINTENANCE ETWiring diagram 22 15 Cab interior lighting and radio 930 900 000 004 Sheet 14 ...
Страница 185: ...185 CARE AND MAINTENANCE ETWiring diagram 22 16 Ventilation and air conditioning 930 900 000 004 Sheet 15 ...
Страница 186: ...186 CARE AND MAINTENANCE ETWiring diagram 22 17 Heater 930 900 000 004 Sheet 16 ...
Страница 187: ...187 CARE AND MAINTENANCE ETWiring diagram 22 18 Heated rear window electrical mirrors 930 900 000 004 Sheet 17 ...
Страница 188: ...188 CARE AND MAINTENANCE ETWiring diagram 22 19 Socket and open separation points seat switch 930 900 000 004 Sheet 18 ...
Страница 189: ...189 CARE AND MAINTENANCE ETWiring diagram 22 20 Implement socket socket event counter 930 900 000 004 Sheet 19 ...
Страница 190: ...190 CARE AND MAINTENANCE ETWiring diagram 22 21 Electronics power supply 930 900 000 004 Sheet 20 ...
Страница 191: ...191 CARE AND MAINTENANCE ETWiring diagram 22 22 Comfort bus K bus 930 900 000 004 Sheet 21 ...
Страница 192: ...192 CARE AND MAINTENANCE ETWiring diagram 22 23 Instrument panel 930 900 000 004 Sheet 22 ...
Страница 193: ...193 CARE AND MAINTENANCE ETWiring diagram 22 24 Electrohydraulic lifting gear control 930 900 000 004 Sheet 23 ...
Страница 196: ...196 CARE AND MAINTENANCE ETWiring diagram 22 27 Transmission bus G bus 930 900 000 004 Sheet 26 ...
Страница 197: ...197 CARE AND MAINTENANCE ETWiring diagram 22 28 Transmission control 930 900 000 004 Sheet 27 ...
Страница 198: ...198 CARE AND MAINTENANCE ETWiring diagram 22 29 Transmission emergency operation 930 900 000 004 Sheet 28 ...
Страница 199: ...199 CARE AND MAINTENANCE ETWiring diagram 22 30 Suspension 930 900 000 004 Sheet 29 ...
Страница 200: ...200 CARE AND MAINTENANCE ETWiring diagram 22 31 PTO 930 900 000 004 Sheet 30 ...
Страница 201: ...201 CARE AND MAINTENANCE ETWiring diagram 22 32 4WD and differential lock 930 900 000 004 Sheet 31 ...
Страница 202: ...202 CARE AND MAINTENANCE ETWiring diagram 22 33 LBS 930 900 000 004 Sheet 32 ...
Страница 203: ...203 CARE AND MAINTENANCE ETWiring diagram 22 34 Engine control 930 900 000 004 Sheet 33 ...
Страница 262: ...262 TECHNICAL DATA ...
Страница 266: ...266 ALPHABETICAL INDEX ...