4
STEP 4
Attach the Platform
t 4MJEFUIFQMBUGPSNPOUPUIFUPXFSQPMFBOETFDVSFJUXJUIGPVS.YNNCPMUTBOEUIF.YNN"MMFO,FZ
STEP 5
Attach VESA Assembly to Tower Pole
t 0QUJPO4JOHMF.POJUPS7FSTJPO
6OTDSFX UIF 7&4" ,OPCT GSPN UIF 7&4" "TTFNCMZ 1MBDF UIF
bracket on the front-side of the tower pole and the support bar
on the rear. Tigthen knobs to secure Assembly to pole.
t 0QUJPO%VBM.POJUPS7FSTJPO
6OTDSFXUIF7&4",OPCTGSPNUIF%VBM7&4""TTFNCMZ1MBDFUIF
bracket on the front-side of the tower pole and the dual cross bar
on the rear. Tighten knobs to secure Dual Assembly to pole.
STEP 6
Attach Monitors
t
*OTFSUUXP.YNNCPMUTJOUPUIFUPQUXPIPMFTPGNPOJUPS T
Do not tighten all the way.
t
Hook the monitor onto the VESA Assembly and add two additional
M4x12mm bolts to the bottom two holes. Tighten all four bolts.
t 5PBEKVTUUIF7&4""TTFNCMZUFOTJPOSFNPWFUIFQMBTUJDDBQBOE
use the provided 13mm Hex Wrenches
ASSEMBLY CONTINUED
M
D
A
A
G
G
H
STEP 7
Attach the Lever to the Platform
t "UUBDIUIF)BOEMFPOUIFMFGUPSSJHIUTJEFVTJOHUXP.YNN
bolts and M4x55mm Allen Key.
t 3FNPWFUIFDBCMFUJFGSPNUIFIBOEMF
H
M
K
L