background image

8

9

The   care   you   take   in   reading   and   following   this instruction will  
probably  determinate  the  satisfactory  service  you  will    receive    from  
your Furnace.

UNPACKING.

Carefully remove the Equipment from the shipping case. Preserve all 
paper work for future reference. If damage has occurred from shipment a 
claim must be filed with the carrier immediately; preserve the shipping 
container for inspection by the carrier. Contact your dealer or Felisa. 

INSTALLATION.

Install your Furnace using a connection of the adequate voltage. See the 
label specification  before connecting. The Furnace can  be  installed on 
any surface or table sufficiently firm and   strong,   leaving   a   minimum 
space of 10 cm. Between the Furnace and any other vertical surface 
Keep the area around free of any material to allow ventilation in the area 
of the bottom. For   correct   operation  it   is   necessary   that   the   user  
becomes familiarized with all the available controls and specifications 
shown in each model.

LOAD IN THE CHAMBER

   

 

.

It is very important not to overload the chamber. For the right heating  of 
the load, it should occupy no  more  than  2/3  of  any  dimension  of  the 
chamber. The Furnace heats up any load by radiation and  will   heat as 
fast as it absorbs this energy. Try to center the load, the Furnace can not 
be forced without risk of damage.  

FURNACE OPERATION

 

.  

Control general description.                                                                                              
The  control  has  implemented  a  Fuzzy  algorithm  to  control  the 
temperature, has a  graphic display and a serial communication port for 
sending data to either a terminal or a thermal printer (optional depending 
on each model).

BUTTONS DESCRIPTION

  

.

 Cancel

: This button returns you to the previous menu and abort a 

running cycle. 

Set

: Selects between the operations of each screen.

Above

: Increases the selected parameter.

Down

: Decreases the selected parameter.

MENUS.

1  Start
2  Cycle
3  Cycle type
4  Configuration
5  Print – Graphic
6  Calibration

 

 

.    

CONTROL ON

                                                                                                   

To  turn  the  control  on,  press  the  switch  to  on  position  .  Immediately 
following will print the screen (1) for a few seconds, the operating system 
will recognize the operation of the temperature sensor, the strength and 
integrity of the line voltage. Upon completion of these tasks will hear a 
beep  and  the  review screen  print  (2). The  control  system requires  to 
connect to a line grounded to avoid electrical noise problems, also the 
control system makes detection to line and verify that the supply voltage 
is correct.

(1)

(2)

felisa

R

www.felisa.com.mx

Содержание FE-340

Страница 1: ...a San Juan de Ocotan C P 45019 Zapopan Jalisco M xico Tels 33 31106077 31106002 31102168 31102169 Fax 33 31106103 http www felisa com mx e mail ventas felisa com mx Instructivo de Operaci n para Mu as...

Страница 2: ...es will be at customer expense Maximum liability is in no case to exceed the value of the Felisa product involved Felisa has the right to change or modify the products in order to improve their presen...

Страница 3: ...n con un programador indicador micro controlado para l control de la temperatura el cual opera con un sensor termopar tipo K Este ha sido dise ado con elementos de alta calidad y precisi n su electr n...

Страница 4: ...6034 1 31 6282 20 Ensamble gabinete control Assemby gabinet control 1 31 4082 1 31 6082 1 31 6283 21 Ensamble puerta Assembly door 1 31 4083 1 31 6083 4 31 6234 22 Pata de hule Bolt 4 30 3619 4 41 092...

Страница 5: ...l voltaje de l nea Al terminar estas tareas se escuchara un beep y se imprimir la pantalla de revisi n 2 El sistema de control requiere se conecte a una l nea aterrizada para evitar problemas de ruido...

Страница 6: ...it out gently These will leave in sight the terminals of the heating element 4 Cut the terminals or disconnect Remove the element and the base 5 Place the element downwards place a ruler over the bore...

Страница 7: ...emperatura dentro de la c mara para tomar las mediciones y comparar contra el sistema de control Para ingresar a este men debe regresar al men de ciclo 3 y presionar la tecla Cancelar e Incremento al...

Страница 8: ...cessary to select and press the Set button then the parameter will shade 8 this indicates that we can change its value with the increase or decrease buttons When we get the desired value of the parame...

Страница 9: ...te las tuercas 9 Coloque el aislante tapa interior termopar y tapa posterior 10 Caliente su mu a COMO REMPLAZAR LOS ELEMENTOS CALEFACTORES FE 360 Y 363 FE 1 Retire la tapa posterior 9 2 Retire las tue...

Страница 10: ...on of the chamber The Furnace heats up any load by radiation and will heat as fast as it absorbs this energy Try to center the load the Furnace can not be forced without risk of damage FURNACE OPERATI...

Отзывы: