![Fei Bao MiG-21 Fishbed Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/fei-bao/mig-21-fishbed/mig-21-fishbed_instruction-manual_548719005.webp)
Fei Bao MiG-21 Fishbed Instruction Manual (Draft Rev 0)
Page 5 of 24
Provided spool valve & JR 341 servo or equivalent
Solution #2
Jet-Tronics Dual Action electronic pneumatic valve
Other Pneumatic Components
Many builders prefer to install pressure gauges in the retract and brake systems to easily
monitor system pressure. Dual fill valves may be installed to maintain isolation between these
two systems.
Other Parts
Ultimate Air Trap (UAT)
Fuel tank vent fitting
Manual fuel shutoff valve
Safety wire
Blue thread-locker
Glues: cyanoacrylate (CA) glue (thin, medium, and thick), Loctite Hysol, Zap-a-Dap-a-Goo
Batteries (Receiver and ECU)
Regulator and switch
Servo extensions (length may vary, depending on receiver placement)
Control linkage hardware as preferred by the builder
Additional Required Tools
X-Acto knife, #11 blades
Acetone/alcohol swabs
Felt-tip marker
Pencil
Ruler (metric and imperial)
Drill
Drill bits
Pin Vice
Sandpaper (course and fine grades)
Pliers
Side cutters
Double-sided tape
Jewelers files (various shapes)
Thread locker (blue)
Dremel tool and assorted bits
Phillips screwdriver
Various balsa and hardwood stock (servo rails)