Fit the supplied air ducting as required, cutting it down to suitable length to allow for installation.
Continue the installation of the remaining on-board equipment; the prototype used a PowerBox
Royal SRS twin receiver/battery system being powered by 6.6v 3000mAh Li-Fe batteries.