- 23 -
ITR Refrigerated Remote Models
Cabinet Preparation
The ITR Remote models have a large condensate evaporator compartment hanging from the bottom of case
that contains the condensate evaporator pan. This compartment hangs inside the cabinet compartment. The
interior of the cabinet must be open to allow space for this compartment. The countertop must be cut to
allow the case’s base and condenser compartment to drop into the cabinet interior. Use the diagram below
for cutout dimensions.
Once the case is placed into cutout it must be secured to cabinet using brackets and wood screws provided.
IMPORTANT: When placing cases in a line up the number of end panels used will be different. The cut
out and hole placement dimension will need to be adjusted for each particular line up circumstance. See
LINE UP INTALLATION section of this manual.
The condensate air louvers are located on each side of the condensate evaporator compartment. Do not
block these louvers. The louver panel provided with case must be installed in the cabinet to allow
condensate moisture to vent. The louver can be placed on any side of cabinet, but must be as near to the top
as possible. A 6” minimum clearance must be maintained from cabinet louver.
Connect remote refrigeration lines
1. Remove the cover by removing the (4) screws on the bottom of case inside the cabinet
compartment.
1.
Connect remote refrigeration as described in the Remote Connection section in this manual. A 2-3/4
hole through the condensate evaporator compartment is provided.
2.
Make sure that the drain line has not been dislodged during shipment and that the drain trap is
located properly over the water reservoir of the condensate evaporator pan.
3.
Reinstall evaporator condensate cover.