21
Federal Signal
signaling.fedsig.com
Assembly with two mounting screws
The hammer bar can be pulled directly out from its retaining
bracket for access to the two mounting holes that are for the
attachment of the two supplied #4 screws. Carefully screw
the bracket onto the rear housing. DO NOT OVERTIGHTEN
AS THIS MAY DAMAGE THE THREAD ENGAGEMENT TO THE
REAR HOUSING.
Figure 30 Attaching the bracket
Installing/Servicing the Optional Stainless Steel Faceplate Labels
NOTE:
The stainless steel faceplate labels are only to be used on non-EN54-11 stations. Applying one of these labels
over the factory-installed EN54-11 flaming building label will void its certification.
These labels are provided separately as a service/accessory part. (See the Replacemtn Parts table on page 23.)
Available black text on the labels are FIRE, EVAC, GAS ALARM, or BIOHAZARD ALARM. The labels have a peel-off paper
liner exposing a pressure-sensitive adhesive backing. Initial placement is critical, as the adhesive is aggressive, once it
touches the station faceplate’s designated label area. Make sure the application area is free from any dirt, smudges, or
oil prior to application.
Figure 31 Installing the label
OPTIONAL INDIVIDUAL STAINLESS STEEL FACEPLATE LABEL
SUPPLIED AS SERVICE /ACCESSORY PART
PEEL OFF LABEL LINER
FOR ADHESIVE BACKED
APPLICATION TO
FACEPLATE FRONT
Installing/Servicing the Optional Stainless Steel Custom Duty Plate
NOTE:
The stainless steel Duty Plate kit cannot be used with BG (break glass) stations that have the Hammer Bar option
already installed.
These plates are provided separately as a custom order service/accessory part (see Table 2 on page 23), having the
end user provide desired text/artwork for their specific application. The duty plates have a peel-off paper liner exposing
a pressure-sensitive adhesive backing. Initial placement is critical as the adhesive is aggressive once it touches the
station faceplate’s designated label area. Make sure the application area is free from any dirt, smudges, or oil prior
to application. Two screws are also provided so that the plate is securely held in place during the station’s life usage.
Consult the factory for the lead time regarding the fabrication of custom duty plates along with minimum order quantity.