Specifications Continued
Maintenance Schedule
By following the schedule of preventive maintenance presented below, the HPB will deliver years
of trouble-free performance.
One (1) day after commissioning
1. Fill out and submit all warranty documentation to FEDCO.
Six (6) months after commissioning
1. Inspect for leaks, damaged gaskets and condition of all pipe couplings.
2. Wipe booster and baseplate with a clean, damp cloth.
Annually
1. Inspect for leaks, damaged gaskets and condition of all pipe couplings.
2. Wipe booster and baseplate with a clean, damp cloth.
Every five (5) years
1. Annual maintenance per above.
2. A complete disassembly, cleaning and detailed inspection of all booster components is recom
-
mended. Refer to
Booster Overhaul
in the
HPB-2800 Overhaul Manual
. HPB overhaul part kits
can obtained by contacting FEDCO.
NOTES:
Please provide unit serial number when ordering field service kits.
Service Parts Kits
Contact a FEDCO representative for recommended spare parts.
Ordering Parts
To order a component or service kit, simply contact a FEDCO representative at:
ATTN: Field Service Department
Additional Contact Information:
FEDCO
Tel 734-241-3935
800 Ternes Drive
Fax 734-241-5173
Monroe, MI 48162
Email [email protected]
USA
Web
site
www.fedco-usa.com
Choose the “Service and Support” tab