FEB HV5120-S Series Скачать руководство пользователя страница 16

16 

23 

 

 

 

 

 

NOT allowed 

NOT allowed 

NOT allowed 

 

Figure 5-2 

 

5.4 Installation Steps 

 

Warning

 

1) 

Follow local electric safety and installation policy, a suitable breaker between battery system and inverter 

is required. 

2) 

All installation and operation must follow local electric standard and requirements. 

3) 

When battery modules are paralleled, the system should be powered off before installation operation

Содержание HV5120-S Series

Страница 1: ...High Voltage Energy Storage System Battery HV5120 S Series Product Manual...

Страница 2: ...res 5 3 2 Specification 6 3 3 Equipment interface instruction 7 4 Safe Handling of Lithium iron ESS Batteries Guide 12 4 1 Solution Diagram 12 4 2 Danger Label 12 4 3 Tool 12 4 4 Safety Gear 13 5 Inst...

Страница 3: ...ic shock Power off the equipment before any operation Grounding indicate PE cable connection position Do not place in areas accessible to children Keep the battery away from open fire or ignition sour...

Страница 4: ...nd provisions of the manual 12 Direct or indirect damages caused by the above reasons are not covered by warranty claim Warning 2 1 Before Connecting 1 Please check the external packaging condition be...

Страница 5: ...multiple modules are series connected module addresses are set automatically 3 Support for upgrading the battery module from the upper controller through CAN communication 4 The module is non toxic no...

Страница 6: ...nal Capacity 5 12kWh 5 Usable Capacity 4 86kWh 95 DOD 6 Nominal Voltage 102 4V 7 Working Voltage 91 2 115 2V 8 Charging Voltage 112V 9 Max Charge Current 25A 10 Max Discharge Current 40A 11 Communicat...

Страница 7: ...7 23 Figure 3 2 3 3 Equipment interface instruction Figure 3 3...

Страница 8: ...mark Power off Power off Light is off Run Standby Charge Discharge Light is on Alarm Level Alarm System can run but there will be alarm tips Level Alarm System will stop and check the problem Note Des...

Страница 9: ...he Isolating Switch to ON position Positive Power Terminal will connect with the HV battery contactor and Negative Power Terminal will connect with the battery HV on the other hand when Isolating Swit...

Страница 10: ...85 1 Communication with PCS by RS485 CAN3 Communication with PCS by CAN CAN1 Master slave communication channel CAN communication port with upper computer or display monitor Figure 3 8 Pin Definition...

Страница 11: ...L ADDR_DO Output signal for Master BCU to arrange the address 24V 24V signal CAN communication CAN bus for each rack and upper computer or display monitor CAN2H CAH2L For battery debug usage Figure 3...

Страница 12: ...arrange the address RS485 2 communication RS485 for each rack and upper computer or display monitor RS485 2A RS485 2B 4 Safe Handling of Lithium iron ESS Batteries Guide 4 1 Solution Diagram Figure 4...

Страница 13: ...t circuits If tools are not insulated cover the entire exposed metal surfaces of available tools with electrical tape except their tips 4 4 Safety Gear It is recommended to wear the following safety g...

Страница 14: ...s 1 For battery module package Battery Module 2 For packing box of high voltage box NOTE Power and communication cables connect to inverter belongs to the packing box of high voltage box 2 2000mm 6AWG...

Страница 15: ...are maintained at a constant level 6 There is just a little dust and dirt in the area 7 The distance from heat source should be more than 2 meters 8 The distance from air outlet of inverter is more t...

Страница 16: ...al electric safety and installation policy a suitable breaker between battery system and inverter is required 2 All installation and operation must follow local electric standard and requirements 3 Wh...

Страница 17: ...he brackets to the HV Box of the battery rack using 2 pcs M4 10 socket head cap screws with locking torque of2 5N m Figure 5 4 3 Place the base against the wall and mark the position of mounting holes...

Страница 18: ...the wall with position of mounting holes on the wall with 2 pcs M6 expansion screws by 8N m Figure 5 7 5 Then lay the battery module one by one on the base and fix all the M4 8 sunk screws on the left...

Страница 19: ...of the inverter PCS is same level with the battery system before connection Check all the power switches are OFF System turns on step 1 Check all cables are connected correctly Check grounding is con...

Страница 20: ...ation Evacuate contaminated area and seek medical aid 2 Contact with eyes Rinse eyes with flowing water for 15 minutes and seek medical aid 3 Contact with skin Wash affected area thoroughly with soap...

Страница 21: ...e make sure the SOC is charged to higher than 85 2 Check installation environment such as dust water insect etc Make sure it is suitable for IP20 battery system Connection of power connector grounding...