Dis assembly instrcutions.
Disassembly Sequence, Time Schedule and Tools
Requirement for AL 60/30 Panel system
.
Table 1
Sl,No
Activity
Time in
min
Tools required
1.
Disconnect sockets/switches and take
out the cables.
4
Cordless
machine
2.
Removal of Table Tops
3
Cordless
machine
3.
Removal of Gabel Ends
3
Cordless
machine
4.
Removal of main Spine frames
3
Manual
5.
Packing Of Materials.
2
Manual
Total time per work station- 15 Mins.
The timings are based on a cluster of 4 work stations. The dismantling team
consists of two persons. For dismantling more number of work stations, larger
team can be used and the activity can be telescoped
.