FE PETRO STP-SCI Скачать руководство пользователя страница 9

 

9

Flashes
/Beeps 

Condition 

Potential Causes 

Proposed Action 

Open Circuit  

Connection broken from 

STP-SCI to PMA  

 

Or 

  

Locked Rotor w/ Thermal 

Overload Open 

 

Or 

 

Incorrectly wired through 

capacitor 

 

Or 

 

Relay Failure 

1. 

Wait 5 minutes before pushing the reset button on the STP-SCI.  This will 
allow the motor thermal overload to reset if locked rotor has occurred.  
Check for proper operation of system; if operating correctly do not continue 
to next step.  If condition is still present continue to next step. 

2. 

Disconnect power at load center, lock and tag out circuit breakers. 

3. 

Remove the two motor control outputs (M1 and M2) from the STP-SCI unit. 

4.  Using an ohmmeter (low range setting), place leads between two wires 

going to the STP, this is the first step in determining where the open circuit 
has occurred.  Correct readings between M1 and M2 wires (orange and 
black) should match that of the motor being used +/-1 ohms.  These 
readings can be found in TB004 or the STP/IST Fixed & Variable Length 
Installation and Owner’s Manual. Readings between any of the motor wires 
and ground should be an open circuit.  If readings in this step are incorrect, 
continue with the next step.  If readings are correct go to step 7. 

5. 

Check and verify capacitor wiring is correct in STP junction box.  Refer to 
the STP/IST Fixed & Variable Length Installation and Owner’s Manual for 
wiring diagram or SB003.  If condition has been corrected, do not continue 
with next step.  If wired correctly and condition is still present, continue with 
next step. 

6.  Go to the submerged turbine and remove the cover at the top of the 

extractable manifold.  Remove the three wire nuts and continue conductivity 
tests on the three wires going to the motor. Readings between any of the 
motor wires and ground should be an open circuit.  If readings are incorrect 
and there are no problems with the lead assembly wiring, go to 

“PMA 

Replacement/Inspection”

 in 3 flash section. If readings are correct, there is 

problem with the wiring between the STP-SCI and this point, continue with 
next step. 

7.  Remove the junction box cover and do conductivity test on wires in the 

junction box after the capacitor through the extractable discharge head 
(orange to orange, red to red, and black to black).  If wires are not 
conducting, replace the male and female connectors of the STP.  See 
STP/IST Fixed & Variable Length Installation and Owner’s Manual for 
replacement parts.  Check for proper operation. If operating correctly, do not 
continue.  If conductivity readings are correct and the condition is still 
present, continue to next step. 

8. 

Upper Board relay may be stuck open or damaged. Replace Upper Board 
(Relay Assembly); see 

“Replacement Parts”

 section for part number. Turn 

on power to the STP-SCI unit and verify correct system operation. 

Uncalibrated New 

Installation 

Note:  

All STP-SCI’s must be calibrated prior to operation.   

1.  Calibrate STP-SCI per 

“Calibration”

 section. 

If controller calibrates, do not continue to next step.  If abnormal condition is 
indicated, Count Flashes/beeps before pushing reset button. Follow 
troubleshooting guide for the indicated condition.  Correct condition and 
recalibrate. 

2. 

Check the following: 

  Calibration is done at no flow (close STP clamp valve or ball valve in 

line). 

  Dispenser hook signal is applied within 10 min. of putting controller in 

calibration mode. 

 

No open circuits between controller and motor. 

 

Lines have been purged of air. 

 Locked 

Rotor 

Extended 

Run 

Continuous Hook Signal 

applied for more than 60 

min. without pumping 

product 

1. 

Disconnect power at load centers, lock and tag out circuit breakers. 

2. 

Check voltage across hook terminal with all dispenser handles off.  There 
should be no voltage applied.  If voltage is present, contact an electrician to 
correct the problem.  After the problem has been corrected, turn on power to 
the STP-SCI and verify system is operating correctly. 

10 

Relay Fault 

Relay contact failure 

The STP will continue to run after this fault indication is 
displayed. 

1. 

Disconnect power at load centers, lock and tag out circuit breakers. 

2. 

Replace Upper Board (Relay Assembly), see 

“Replacement Parts” 

section. 

3. 

Turn on power to the STP-SCI unit and verify correct system operation. 

 

 

Contact FE Petro for additional troubleshooting information at 1-800-225-9787.

 

Caution

Содержание STP-SCI

Страница 1: ...klin Fueling 3760 Marsh Rd Madison WI 53718 USA Tel 1 608 838 8786 800 225 9787 Fax 1 608 838 6433 www franklinfueling com Installation and Owner s Manual Software Revision 1 4 SMART CONTROLLER I STP...

Страница 2: ...identally turned on while the STP SCI is being installed electrical power could be applied to the STP SCI creating the risk of potentially lethal electrical shock hazard ALWAYS tag and lock breakers s...

Страница 3: ...gure 5 for Master Slave AC Configurations Connect Communication cable RS 485 to terminals G and wire together G together and together then wire the shielded cable drain wire to Ground G at one end onl...

Страница 4: ...c line leak detection is used make sure the STP SCI is in calibration mode all three lights flashing alternately before the dispenser handle is turned on If it is not the STP SCI will not turn on and...

Страница 5: ...n Off Off Slave 8 Off Off Off On Off Slave 9 On Off Off On Off Slave 10 Off On Off On Off Slave 11 On On Off On Off Slave 12 Off Off On On Off Slave 13 On Off On On Off Slave 14 Off On On On Off Slave...

Страница 6: ...ed switch in the ON position the controller will operate as a standard control box It will not indicate or shut down any abnormal condition with the exception of an over current condition short or loc...

Страница 7: ...y still be power present at the STP SCI Hook Terminal If this condition exists call FE Petro Technical Service for assistance Red Light Flashing Alarm Beeping Abnormal condition Determine the number o...

Страница 8: ...acement Inspection 2 Disconnect input voltage at load center lock and tag out circuit breakers 3 See PMA Replacement Instructions P N 400289002 included with New PMA Disengage the 3 4 securing bolt of...

Страница 9: ...t step 7 Remove the junction box cover and do conductivity test on wires in the junction box after the capacitor through the extractable discharge head orange to orange red to red and black to black I...

Страница 10: ...10 Figure 2 STP SCI Stand Alone Wiring Diagram...

Страница 11: ...11 Figure 3 STP SCI Master Slave Wiring Diagram...

Страница 12: ...12 Figure 4 STP SCI Alternating Circuit Wiring Diagram...

Страница 13: ...13 Figure 5 STP SCI Master Slave Alternating Circuit Wiring Diagram...

Страница 14: ...14 REPLACEMENT PARTS Upper Board Relay Assembly P N 225005930 Lower Board Control Assembly P N 225000930 Lower Board Upper Board Picture 4...

Страница 15: ...15 This page intentionally left blank...

Страница 16: ...2004 FE Petro Form No 223987101 Rev 4...

Отзывы: