uEZ GUI Start Here Guide
UEZGUI-1788-56VI
Rev. 1.11 Aug 31, 2016
Page 10
14.
Click the [OK] button to exit the dialog. Proceed to step 17
15.
If using Crossworks, proceed to step 16, otherwise proceed to step 17.
16.
Click “Target > Connect > SEGGER J-Link” from the drop down menu. This activates
the J-Link probe.
17.
Build (if needed), download and run the project following the respective IDE steps.
For IAR: Press [Ctrl]+[D] or select “Project > Download and Debug” from the menu
at the top.
For Crossworks: Press [F5] or select “Debug > Go” from the menu at the top.
18.
If the debugger has halted on a breakpoint, press [F5] to make the project run.
After the project is running on the µEZ GUI, a simple window is shown with three text
bars.
Figure 14:
Initial
project
Figure 12:
Debug
Settings
Figure 13:
Debug
Settings