![Fayat Dynapac Redline DRF25-70C Скачать руководство пользователя страница 230](http://html1.mh-extra.com/html/fayat/dynapac-redline-drf25-70c/dynapac-redline-drf25-70c_instruction-manual_546875230.webp)
E 10 30
A
Assembly of the short version is described in the following, as the longer variant is
achieved simply by adding further module elements.
The distances between the sensors are ideally identical (X1 = X2).
A
The centre sensor is mounted in the usual individual sensor position so that, if nec-
essary, work can be carried out with just one sensor by switching over on the MOBA-
matic (e.g. at the start of paving, road junctions, etc…)
A
Depending on application, the mechanism can be mounted at the side next to the
screed or also above the screed. This is dependent on the paving width required in
each case.
A
The procedure for mounting the big ski is the same in both cases.
A
So that the big ski can be operated as parallel to the ground as possible during pav-
ing, it must be attached according to the subsequent paving conditions. To do this,
the screed should be lowered to the desired course thickness and the traction point
should be set appropriately.
m
When mounting the two crossbeam brackets, it is vital to ensure that these do not
hamper the free movement of either the crossbeam or the screed construction! Clear-
ance must be guaranteed throughout the entire working range!
MBS11.bmp
Содержание Dynapac Redline DRF25-70C
Страница 2: ...www dynapac com ...
Страница 26: ...A 2 ...
Страница 34: ...B 8 4 Safety devices 1 3 5 10 7 9 11 4 5 6 7 12 2 8 ...
Страница 45: ...B 20 71 70 40 41 42 xxxxxxxxxxxxxxxxx 9 9 7 7 ...
Страница 90: ...D 10 4 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Страница 92: ...D 10 6 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Страница 94: ...D 10 8 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Страница 96: ...D 10 10 24 23 ...
Страница 98: ...D 10 12 28 26 27 25 ...
Страница 100: ...D 10 14 28 26 27 25 ...
Страница 102: ...D 10 16 30 29 ...
Страница 104: ...D 10 18 32 31 ...
Страница 106: ...D 10 20 34 35 33 ...
Страница 108: ...D 10 22 37 36 ...
Страница 110: ...D 10 24 39 38 ...
Страница 112: ...D 10 26 40 41 42 43 ...
Страница 114: ...D 10 28 44 46 47 45 ...
Страница 116: ...D 10 30 77 78 79 80 81 82 83 70 71 72 73 74 75 76 ...
Страница 118: ...D 10 32 77 78 79 80 81 82 83 70 71 72 73 74 75 76 ...
Страница 122: ...D 10 42 90 91 92 94 93 95 96 96 ...
Страница 124: ...D 10 44 ...
Страница 155: ...D 40 5 1 3 10 2 8 9 6 7 4 5 ...
Страница 157: ...D 40 7 1 3 10 2 8 9 6 7 4 5 ...
Страница 160: ...D 40 10 2 1 ...
Страница 161: ...D 40 11 After starting m Let the paver finisher warm up for approx 5 minutes if the engine is cold ...
Страница 162: ...D 40 12 2 3 1 ...
Страница 164: ...D 40 14 1 2 5 7 6 3 ...
Страница 166: ...D 40 16 2 2 3 1 5 4 ...
Страница 170: ...D 40 20 5 4 A 2 1 3 ...
Страница 172: ...D 40 22 3 1 4 8 9 2 5 7 6 10 11 ...
Страница 176: ...D 40 26 1 2 B A C A C ...
Страница 178: ...D 40 28 1 2 B A C A C 3 4 ...
Страница 180: ...D 40 30 1 2 B A C A C 3 4 ...
Страница 182: ...D 40 32 1 2 ...
Страница 184: ...D 40 34 1 3 10 9 2 8 7 6 5 4 ...
Страница 186: ...D 40 36 2 Malfunctions 2 1 Error code query for engine 3 1 2 ...
Страница 190: ...D 40 40 2 2 Error codes ...
Страница 191: ...D 40 41 ...
Страница 192: ...D 40 42 ...
Страница 193: ...D 40 43 ...
Страница 194: ...D 40 44 ...
Страница 195: ...D 40 45 ...
Страница 196: ...D 40 46 ...
Страница 213: ...E 10 11 Symbol Meaning Outer auger bearing Auger end bearing ...
Страница 216: ...E 10 14 Auger upgrading working width 6 34 m m m 960 BR 640 R 160 L 640 L 960 BL 960 L 960 160R 960 R 960 ...
Страница 220: ...E 10 19 3 3 Mounting the auger brace 11 8 12 20 19 15 14 26 16 18 26 21 1 10 13 17 27 23 1 2 3 4 5 6 7 18 22 23 24 25 ...
Страница 249: ...F 20 1 F 20 Maintenance review 1 Maintenance review 73 40 50 80 90 100 30 60 ...
Страница 251: ...F 30 1 F 30 Maintenance conveyor 1 Maintenance conveyor ...
Страница 258: ...F 30 8 ...
Страница 259: ...F 40 1 F 40 Maintenance auger assembly 1 Maintenance auger assembly ...
Страница 287: ...F 60 1 F 60 Maintenance hydraulic system 1 Maintenance hydraulic system ...
Страница 302: ...F 60 16 ...
Страница 303: ...F 73 1 F 73 Maintenance drive units 1 Maintenance drive units ...
Страница 316: ...F 73 14 ...
Страница 317: ...1 F 80 Maintenance electrical system 1 Maintenance electrical system ...
Страница 327: ...11 Relays in the engine compartment K Function 0 Engine start ...
Страница 331: ...15 Relay in connection box under the operating platform K Function 40 Raise roof 41 Lower roof ...
Страница 332: ...16 ...
Страница 340: ...F 90 8 ...
Страница 341: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping ...
Страница 352: ...F 100 12 ...
Страница 354: ...F 110 2 2 4 7 5 6 6 3 1 ...
Страница 360: ...F 110 8 ...
Страница 361: ...www dynapac com Dynapac China Compaction Paving Equipment Co Ltd Tianjin China ...