![Fayat Dynapac Redline DRF25-70C Скачать руководство пользователя страница 208](http://html1.mh-extra.com/html/fayat/dynapac-redline-drf25-70c/dynapac-redline-drf25-70c_instruction-manual_546875208.webp)
E 10 6
3
Auger extension
Depending on the type of screed, the most diversified working widths can be reached.
A
Auger and screed extension must match.
Refer to the appropriate chapter "Set-up and modification" in the screed
operating instructions:
– screed extension chart
To attain the desired working width, the respective screed extensions, side plates, au-
gers, tunnel plates or cut-off shoes must be mounted.
For working widths of more than 3.00 m, the auger should be fitted with extension
parts on both sides to improve material distribution and to reduce the wear.
f
The diesel engine must be switched off whenever work is performed on the auger.
Danger of injuries!
A
If the operating conditions on the construction site permit an auger extension to be
fitted, or render this necessary, always additionally fit the outer auger bearings.
For auger width extensions with an outer auger bearing on the basic unit, fit the short-
er auger blade to the bearing. Otherwise, destruction between the auger blade and
bearing may occur.
Auger_DEM.bmp
Содержание Dynapac Redline DRF25-70C
Страница 2: ...www dynapac com ...
Страница 26: ...A 2 ...
Страница 34: ...B 8 4 Safety devices 1 3 5 10 7 9 11 4 5 6 7 12 2 8 ...
Страница 45: ...B 20 71 70 40 41 42 xxxxxxxxxxxxxxxxx 9 9 7 7 ...
Страница 90: ...D 10 4 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Страница 92: ...D 10 6 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Страница 94: ...D 10 8 10 15 16 19 18 20 17 14 11 12 13 10 21 22 ...
Страница 96: ...D 10 10 24 23 ...
Страница 98: ...D 10 12 28 26 27 25 ...
Страница 100: ...D 10 14 28 26 27 25 ...
Страница 102: ...D 10 16 30 29 ...
Страница 104: ...D 10 18 32 31 ...
Страница 106: ...D 10 20 34 35 33 ...
Страница 108: ...D 10 22 37 36 ...
Страница 110: ...D 10 24 39 38 ...
Страница 112: ...D 10 26 40 41 42 43 ...
Страница 114: ...D 10 28 44 46 47 45 ...
Страница 116: ...D 10 30 77 78 79 80 81 82 83 70 71 72 73 74 75 76 ...
Страница 118: ...D 10 32 77 78 79 80 81 82 83 70 71 72 73 74 75 76 ...
Страница 122: ...D 10 42 90 91 92 94 93 95 96 96 ...
Страница 124: ...D 10 44 ...
Страница 155: ...D 40 5 1 3 10 2 8 9 6 7 4 5 ...
Страница 157: ...D 40 7 1 3 10 2 8 9 6 7 4 5 ...
Страница 160: ...D 40 10 2 1 ...
Страница 161: ...D 40 11 After starting m Let the paver finisher warm up for approx 5 minutes if the engine is cold ...
Страница 162: ...D 40 12 2 3 1 ...
Страница 164: ...D 40 14 1 2 5 7 6 3 ...
Страница 166: ...D 40 16 2 2 3 1 5 4 ...
Страница 170: ...D 40 20 5 4 A 2 1 3 ...
Страница 172: ...D 40 22 3 1 4 8 9 2 5 7 6 10 11 ...
Страница 176: ...D 40 26 1 2 B A C A C ...
Страница 178: ...D 40 28 1 2 B A C A C 3 4 ...
Страница 180: ...D 40 30 1 2 B A C A C 3 4 ...
Страница 182: ...D 40 32 1 2 ...
Страница 184: ...D 40 34 1 3 10 9 2 8 7 6 5 4 ...
Страница 186: ...D 40 36 2 Malfunctions 2 1 Error code query for engine 3 1 2 ...
Страница 190: ...D 40 40 2 2 Error codes ...
Страница 191: ...D 40 41 ...
Страница 192: ...D 40 42 ...
Страница 193: ...D 40 43 ...
Страница 194: ...D 40 44 ...
Страница 195: ...D 40 45 ...
Страница 196: ...D 40 46 ...
Страница 213: ...E 10 11 Symbol Meaning Outer auger bearing Auger end bearing ...
Страница 216: ...E 10 14 Auger upgrading working width 6 34 m m m 960 BR 640 R 160 L 640 L 960 BL 960 L 960 160R 960 R 960 ...
Страница 220: ...E 10 19 3 3 Mounting the auger brace 11 8 12 20 19 15 14 26 16 18 26 21 1 10 13 17 27 23 1 2 3 4 5 6 7 18 22 23 24 25 ...
Страница 249: ...F 20 1 F 20 Maintenance review 1 Maintenance review 73 40 50 80 90 100 30 60 ...
Страница 251: ...F 30 1 F 30 Maintenance conveyor 1 Maintenance conveyor ...
Страница 258: ...F 30 8 ...
Страница 259: ...F 40 1 F 40 Maintenance auger assembly 1 Maintenance auger assembly ...
Страница 287: ...F 60 1 F 60 Maintenance hydraulic system 1 Maintenance hydraulic system ...
Страница 302: ...F 60 16 ...
Страница 303: ...F 73 1 F 73 Maintenance drive units 1 Maintenance drive units ...
Страница 316: ...F 73 14 ...
Страница 317: ...1 F 80 Maintenance electrical system 1 Maintenance electrical system ...
Страница 327: ...11 Relays in the engine compartment K Function 0 Engine start ...
Страница 331: ...15 Relay in connection box under the operating platform K Function 40 Raise roof 41 Lower roof ...
Страница 332: ...16 ...
Страница 340: ...F 90 8 ...
Страница 341: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping ...
Страница 352: ...F 100 12 ...
Страница 354: ...F 110 2 2 4 7 5 6 6 3 1 ...
Страница 360: ...F 110 8 ...
Страница 361: ...www dynapac com Dynapac China Compaction Paving Equipment Co Ltd Tianjin China ...