4.
Slightly loosen the fastening screws (2) on both sides.
5.
Pull the engine carrier forward, remove and replace the V-
belt (1).
6.
Install the new V-belt and pull the engine carrier back.
7.
Tighten the fastening screws (1) on both sides.
8.
Check tension of V-belt, tighten if necessary.
ð
Compression measurement:
approx. 5 mm (0.2 in).
9.
Assemble the V-belt guard (1) with fastening screws (2).
10.
Check the V-belt tension again after 25 operating hours,
tighten if necessary.
8.8.3.1
Checking the frequency of the base plate
Keep feet and hands clear of the vibrating base plate.
2
B-834-0170
1
Fig. 73
1
B-834-0171
Fig. 74
Fig. 75
B-834-0144
1
2
Fig. 76
Maintenance – Annually
DFP8
83
Содержание DYNAPAC DFP8
Страница 6: ...Table of contents DFP8 6...
Страница 7: ...1 Introduction Introduction DFP8 7...
Страница 11: ...2 Technical data Technical data DFP8 11...
Страница 15: ...3 Concerning your safety Concerning your safety DFP8 15...
Страница 39: ...4 Indicators and control elements Indicators and control elements DFP8 39...
Страница 45: ...5 Checks prior to start up Checks prior to start up DFP8 45...
Страница 52: ...Checks prior to start up Checking the water level topping up DFP8 52...
Страница 53: ...6 Operation Operation DFP8 53...
Страница 64: ...Operation Parking the machine in secured condition DFP8 64...
Страница 65: ...7 Loading transporting the machine Loading transporting the machine DFP8 65...
Страница 69: ...8 Maintenance Maintenance DFP8 69...
Страница 100: ...Maintenance As required DFP8 100...
Страница 101: ...9 Troubleshooting Troubleshooting DFP8 101...
Страница 107: ...10 Disposal Disposal DFP8 107...
Страница 109: ......
Страница 110: ......