![Fayat Dynapac CC1300 Скачать руководство пользователя страница 95](http://html1.mh-extra.com/html/fayat/dynapac-cc1300/dynapac-cc1300_instruction-manual_546864095.webp)
Maintenance measures - 250 h
4812161001_J.pdf
2020-02-03
Maintenance measures - 250 h
Every 250/750/1250/1750..... hours of operation (every
3 months)
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Park the roller on a level surface.
The engine must be switched off and the
parking brake activated when checking or
adjusting the roller, unless otherwise specified.
Ensure that there is good ventilation (air
extraction) if the engine is run indoors. Risk of
carbon monoxide poisoning.
Ensure that there is good ventilation (air
extraction) if the engine is run indoors. Risk of
carbon monoxide poisoning.
Coolers
Checking - Cleaning
Fig. Engine compartment
1. Water cooler
2. Hydraulic fluid cooler
2
1
Make sure that the air flow through the coolers (1) and
(2) is unobstructed. Dirty coolers are blown clean with
compressed air or washed clean using a
high-pressure water cleaner.
Blow air or direct water through the cooler in the
opposite direction to that of the cooling air.
Take care when using a high-pressure water jet.
Do not hold the nozzle too near the cooler.
Take care when using a high-pressure water jet.
Do not hold the nozzle too near the cooler.
Wear protective goggles when working with
compressed air or high-pressure water jets.
Wear protective goggles when working with
compressed air or high-pressure water jets.
85
Содержание Dynapac CC1300
Страница 2: ......
Страница 10: ... e 4812161001_J pdf 2020 02 03 ...
Страница 14: ...Introduction 4812161001_J pdf 2020 02 03 4 ...
Страница 22: ...Special instructions 4812161001_J pdf 2020 02 03 12 ...
Страница 32: ...Machine description 4812161001_J pdf 2020 02 03 22 ...
Страница 36: ...Machine description 4812161001_J pdf 2020 02 03 4812129673 Warning CALIFORNIA Proposition 65 26 ...
Страница 38: ...Machine description 4812161001_J pdf 2020 02 03 28 ...
Страница 58: ...Operation 4812161001_J pdf 2020 02 03 48 ...
Страница 68: ...Operating instructions Summary 4812161001_J pdf 2020 02 03 58 ...
Страница 70: ...Operating instructions Summary 4812161001_J pdf 2020 02 03 60 ...
Страница 72: ...Preventive maintenance 4812161001_J pdf 2020 02 03 62 ...
Страница 81: ...Maintenance Maintenance schedule 4812161001_J pdf 2020 02 03 Service Checklist 71 ...
Страница 82: ...Maintenance Maintenance schedule 4812161001_J pdf 2020 02 03 72 ...
Страница 94: ...Maintenance 50h 4812161001_J pdf 2020 02 03 84 ...
Страница 98: ...Maintenance measures 250 h 4812161001_J pdf 2020 02 03 88 ...
Страница 106: ...Maintenance measures 500 h 4812161001_J pdf 2020 02 03 96 ...
Страница 116: ...Maintenance 1000h 4812161001_J pdf 2020 02 03 106 ...
Страница 130: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...