![Fayat Dynapac CC1300 Скачать руководство пользователя страница 71](http://html1.mh-extra.com/html/fayat/dynapac-cc1300/dynapac-cc1300_instruction-manual_546864071.webp)
Preventive maintenance
4812161001_J.pdf
2020-02-03
Preventive maintenance
Complete maintenance is necessary for the machine
to function satisfactorily and at the lowest possible
cost.
The Maintenance section includes the periodic
maintenance that must be carried out on the machine.
The recommended maintenance intervals assume that
the machine is used in a normal environment and
working conditions.
Acceptance and delivery inspection
The machine is tested and adjusted before it leaves
the factory.
On arrival, before delivery to the customer, delivery
inspection must be conducted as per the check list in
the warranty document.
Any transport damage must be reported immediately
to the transport company, as this is not covered by the
product warranty.
Warranty
The warranty is only valid if the stiplulated delivery
inspection and the separate service inspection have
been completed as per the warranty document, and
when the machine has been registered for starting
under the warranty.
The warranty is not valid if damage has been caused
by inadequate service, incorrect use of the machine,
the use of lubricants and hydraulic fluids other than
those specified in the manual, or if any other
adjustments have been made without the requisite
authorisation.
61
Содержание Dynapac CC1300
Страница 2: ......
Страница 10: ... e 4812161001_J pdf 2020 02 03 ...
Страница 14: ...Introduction 4812161001_J pdf 2020 02 03 4 ...
Страница 22: ...Special instructions 4812161001_J pdf 2020 02 03 12 ...
Страница 32: ...Machine description 4812161001_J pdf 2020 02 03 22 ...
Страница 36: ...Machine description 4812161001_J pdf 2020 02 03 4812129673 Warning CALIFORNIA Proposition 65 26 ...
Страница 38: ...Machine description 4812161001_J pdf 2020 02 03 28 ...
Страница 58: ...Operation 4812161001_J pdf 2020 02 03 48 ...
Страница 68: ...Operating instructions Summary 4812161001_J pdf 2020 02 03 58 ...
Страница 70: ...Operating instructions Summary 4812161001_J pdf 2020 02 03 60 ...
Страница 72: ...Preventive maintenance 4812161001_J pdf 2020 02 03 62 ...
Страница 81: ...Maintenance Maintenance schedule 4812161001_J pdf 2020 02 03 Service Checklist 71 ...
Страница 82: ...Maintenance Maintenance schedule 4812161001_J pdf 2020 02 03 72 ...
Страница 94: ...Maintenance 50h 4812161001_J pdf 2020 02 03 84 ...
Страница 98: ...Maintenance measures 250 h 4812161001_J pdf 2020 02 03 88 ...
Страница 106: ...Maintenance measures 500 h 4812161001_J pdf 2020 02 03 96 ...
Страница 116: ...Maintenance 1000h 4812161001_J pdf 2020 02 03 106 ...
Страница 130: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...