6.9 Parking the machine in secured condition
1.
Drive the machine onto level, firm ground.
2.
Shift the travel lever to “Middle” position
and engage it in parking brake position.
ð
The machine will decelerate down to a
standstill and the parking brake will be
applied after approx. 2 seconds.
The parking brake warning light lights
up.
3.
Shift the throttle lever to position “MIN” (idle
speed).
4.
NOTICE!
Danger of engine damage!
– Do not shut down the engine
all of a sudden from full load
speed, but let it idle for about
two minutes.
Turn the ignition key to position “0” and pull
it out.
B-ELE-0263
Fig. 98
B-SYM-0018
Fig. 99
MIN.
MAX II
MAX I
B-880-0159
Fig. 100
B-ELE-0069
Fig. 101
Operation – Parking the machine in secured condition
BW 100 ADM-5
117
Содержание BOMAG BW 100 ADM-5
Страница 9: ...1 Introduction Introduction BW 100 ADM 5 9...
Страница 13: ...2 Technical data Technical data BW 100 ADM 5 13...
Страница 18: ...Technical data Noise and vibration data BW 100 ADM 5 18...
Страница 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65...
Страница 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82...
Страница 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83...
Страница 97: ...6 Operation Operation BW 100 ADM 5 97...
Страница 128: ...Operation Emergency procedures BW 100 ADM 5 128...
Страница 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129...
Страница 139: ...8 Maintenance Maintenance BW 100 ADM 5 139...
Страница 194: ...Maintenance As required BW 100 ADM 5 194...
Страница 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195...
Страница 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200...
Страница 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201...
Страница 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206...
Страница 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212...
Страница 213: ...11 Disposal Disposal BW 100 ADM 5 213...
Страница 215: ......
Страница 216: ......