3.3 Fundamentals for safe operation
3.3.1 Remaining dangers, remaining risks
Despite careful work and compliance with
standards and regulations it cannot be ruled
out that further dangers may arise when
working with and handling the machine.
Both the machine as well as all other system
components comply with the currently valid
safety regulations. Nevertheless, remaining
risks cannot be ruled out completely, even
when using the machine for the purpose it is
intended for and following all information given
in the operating instructions.
A remaining risk can also not be excluded
beyond the actual danger zone of the machine.
Persons remaining in this area must pay partic-
ular attention to the machine, so that they can
react immediately in case of a possible mal-
function, an incident or failure etc.
All persons remaining in the area of the
machine must be informed about the dangers
that arise from the operation of the machine.
3.3.2 Regular safety inspections
Have the machine inspected by an expert /
qualified person as required for the conditions
the machine is working under, but at least once
every year.
3.3.3 Modifications and alterations to the machine
Unauthorized changes to the machine are pro-
hibited for safety reasons.
Original parts and accessories have been spe-
cially designed for this machine.
Concerning your safety – Fundamentals for safe operation
BW 100 ADM-5
27
Содержание BOMAG BW 100 ADM-5
Страница 9: ...1 Introduction Introduction BW 100 ADM 5 9 ...
Страница 13: ...2 Technical data Technical data BW 100 ADM 5 13 ...
Страница 18: ...Technical data Noise and vibration data BW 100 ADM 5 18 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65 ...
Страница 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82 ...
Страница 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83 ...
Страница 97: ...6 Operation Operation BW 100 ADM 5 97 ...
Страница 128: ...Operation Emergency procedures BW 100 ADM 5 128 ...
Страница 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129 ...
Страница 139: ...8 Maintenance Maintenance BW 100 ADM 5 139 ...
Страница 194: ...Maintenance As required BW 100 ADM 5 194 ...
Страница 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195 ...
Страница 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200 ...
Страница 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201 ...
Страница 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206 ...
Страница 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212 ...
Страница 213: ...11 Disposal Disposal BW 100 ADM 5 213 ...
Страница 215: ......
Страница 216: ......