![Fayat Group BOMAG BRP 35/60 D Скачать руководство пользователя страница 96](http://html1.mh-extra.com/html/fayat-group/bomag-brp-35-60-d/bomag-brp-35-60-d_operating-instruction-maintenance-instruction_546916096.webp)
8.11.5.3
Measures before restarting
1.
Replace the fuel filter.
2.
Replace the air filter.
3.
Change the engine oil and clean the oil filter.
4.
Check cables, hoses and lines for cracks and leaks.
5.
Check the service life of hydraulic hoses and replace if nec-
essary.
6.
Start the engine and run it for 15 to 30 minutes with idle
speed.
7.
Check the oil levels.
8.
Clean the machine thoroughly.
Maintenance – As required
BPR 35/60 D
98
Go
to
Discount-Equipment.com
to
order
your
parts